My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/6/1978
CBCC
>
Meetings
>
1970's
>
1978
>
12/6/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:09 AM
Creation date
6/11/2015 10:53:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Board of Supervisors
Document Type
Minutes
Meeting Date
12/06/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />ENGINEER BEINDORF PRESENTED TOM TESSIER OF GERAGHTY & MILLER <br />TO PRESENT THEIR PROPOSAL IN REGARD TO WATER SYSTEM IMPROVEMENTS FOR <br />THE SOUTH COUNTY WATER TAXING DISTRICT. HE NOTED THAT WE NEED TO GET <br />HIS INPUT TO COMPLETE A REPORT BEFORE WE GO.TO FHA FOR SECURING GRANT <br />MONIES. <br />MR. TESSIER INFORMED THE BOARD THAT WHAT THEY ARE GOING TO DO . <br />IS A PRELIMINARY STUDY BASICALLY LOOKING AT ALL THE EXISTING DATA <br />AVAILABLE FOR THE SOUTH COUNTY TAXING DISTRICT AND THE VICINITY. THEY <br />ARE PARTICULARLY INTERESTED IN CONTACTING PUBLIC AGENCIES, SUCH AS THE <br />DER AND THE WATER MANAGEMENT DISTRICTS TO DETERMINE THEIR ATTITUDE <br />ABOUT A PROGRAM OF THIS NATURE. HE NOTED THEY WILL ALSO BE LOOKING AT <br />THE MAJOR USERS IN THE AREA AND ALSO CONTACTING DRILLERS, ENGINEERS, <br />ETC., THOSE FAMILIAR WITH THE AREA, TO LAY THE GROUNDWORK FOR AN <br />INVESTIGATION TO SITE WELLS. <br />CHAIRMAN WODTKE STATED THAT HE UNDERSTANDS THEY WILL BE LOOKING <br />FOR APPROXIMATELY lE MILLION GALLONS PER DAY. <br />MR. TESSIER STATED THAT IS WHAT THEY HAVE BEEN TOLD THIS AREA <br />WILL REQUIRE. HE NOTED THAT IN THE SOUTH COUNTY THEY ARE MORE RESTRICTED <br />IN LOOKING FOR AREAS TO SITE THE WELLS AND ARE LOOKING, FOR A CONSIDERABLY <br />LARGER.VOLUME OF WATER. HE STATED THAT THIS IS GOING TO MESH WITH THE <br />PRE -ENGINEERING STUDIES WHICH ARE DUE FEBRUARY 1ST. <br />ENGINEER BEINDORF FELT THEIR PROPOSAL IS A GOOD ONE AND WELL <br />IN LINE WITH WHAT WE ARE GOING TO NEED, <br />MR. ENG NOTED THAT THEY HAVE TO HAVE THE DATA FROM GERAGHTY <br />& MILLER BEFORE THEY CAN COMPLETE THEIR PRELIMINARY ESTIMATES FOR COST <br />OF WELLFIELDS, ETC. HE FELT THE TIMEFRAME IS QUITE TIGHT, AND THERE <br />MAY POSSIBLY BE A FEW WEEKS DELAY. <br />IT WAS NOTED THESE COSTS ARE REIMBURSABLE UNDER THE LOAN AND <br />GRANT. <br />ON MOTION BY COMMISSIONER Loy, SECONDED BY COMMISSIONER LYONS, <br />THE BOARD UNANIMOUSLY AUTHORIZED THE CHAIRMAN TO EXECUTE AN AGREEMENT <br />WITH•GERAGHTY & MILLER BASED ON THE PROPOSAL SUBMITTED BY THEM; THE <br />AGREEMENT TO BE PREPARED BY ATTORNEY COLLINS. <br />THE AGREEMENT WILL BE MADE A PART OF THE MINUTES WHEN EXECUTED <br />AND RECEIVED. THE PROPOSAL IS AS FOLLOWS: <br />DEC 6 197896 <br />p <br />
The URL can be used to link to this page
Your browser does not support the video tag.