My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/6/1978
CBCC
>
Meetings
>
1970's
>
1978
>
12/6/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:09 AM
Creation date
6/11/2015 10:53:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Board of Supervisors
Document Type
Minutes
Meeting Date
12/06/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w <br />4 <br />g <br />Geraghty & Miller, Inc <br />® 3 e <br />T <br />Conversely, the impact of adjacent users on the diversion and <br />on pumpage from individual well's is important. <br />• <br />f; <br />In this preliminary investigation, Geraghty & Miller -will <br />emphasize the water quality, geology, hydrology, and pumping <br />impacts in this area. The study will not be limited to the <br />shallow aquifer, but will consider the possibility of develop- <br />ment of potable water from the deeper Floridan aquifer as well, <br />i <br />so that cost-effective decisions can be made about the poten- <br />tial productivity of each aquifer. Areas for the best water - <br />supply potential will be identified, and locations most suitable <br />for aquifer testing will be selected. Water quality, potential <br />I <br />contamination, and impacts on adjacent users will be considered <br />e <br />in these selections. After investigating the likely ranges in <br />4 <br />production -well depths and yields,. and alternate production- <br />. <br />well designs and well -field configurations, an aquifer testing <br />t+ <br />program will be devised. The number of wells required for <br />yti testing, their construction and cost, and details of the tests <br />will be described. <br />This program will be tied to the county plans as much as <br />possible. The step -wise development of water resources as <br />demand increases and additional well sites can be acquired will <br />be considered. The ultimate intent of the overall testing <br />i <br />38 FAQ <br />BOO <br />DEC 6 1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.