My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/18/2008
CBCC
>
Meetings
>
2000's
>
2008
>
11/18/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2017 3:58:28 PM
Creation date
10/1/2015 6:19:35 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC / Commissioner Election
Document Type
Minutes
Meeting Date
11/18/2008
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
4023
Book and Page
136, 130-197
Supplemental fields
SmeadsoftID
7260
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPROVEMENTS, APPROVAL OF WORK ORDER NO.8 FOR <br />ENGINEERING DESIGN SER VICES TO RETAIN SCHULKE, BITTLE & <br />STODDARD AND APPROVAL OF PROJECT FOR PUBLIC BID, UCP #3098 <br />ON MOTION by Commissioner Wheeler, SECONDED <br />by Vice Chairman Flescher, the Board unanimously: (1) <br />approved the total construction and consulting costs for <br />the project estimated at $2,064,569.50; (2) approved the <br />project for public bidding through the County Purchasing <br />Division; (3) approved retaining Schulke, Bittle & <br />Stoddard for engineering and surveying services; (4) <br />approved Work Order No. 8 with Schulke, Bittle & <br />Stoddard for a total amount of $108,500.00, and (5) <br />authorized the Chairman to execute same, as <br />recommended in the memorandum of September 24, 2008. <br />WORK ORDER IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />13. COUNTY ATTORNEY MATTERS <br />B.A. POINTE WEST SOUTH VILLAGE. PHASE I P.D.. DEVELOPER: POINTE <br />WEST OF VERO BEACH. LTD.. DEFAULT UNDER SIDEWALK CONTRACT <br />County Attorney Collins reported that Pointe West South Village, which was in <br />default on a sidewalk contract, has requested an extension. They had hoped to have the <br />sidewalks completed before November 18, 2008; however, since the sidewalk construction is <br />two-thirds done, Pointe West needs the extension. Attorney Collins thereafter presented staff's <br />recommendation that the Board grant Pointe West the extension. He noted that Pointe West's <br />cash deposit will be refunded to them upon completion of the sidewalk. <br />44 <br />November 18, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.