Laserfiche WebLink
IMPROVEMENTS, APPROVAL OF WORK ORDER NO.8 FOR <br />ENGINEERING DESIGN SER VICES TO RETAIN SCHULKE, BITTLE & <br />STODDARD AND APPROVAL OF PROJECT FOR PUBLIC BID, UCP #3098 <br />ON MOTION by Commissioner Wheeler, SECONDED <br />by Vice Chairman Flescher, the Board unanimously: (1) <br />approved the total construction and consulting costs for <br />the project estimated at $2,064,569.50; (2) approved the <br />project for public bidding through the County Purchasing <br />Division; (3) approved retaining Schulke, Bittle & <br />Stoddard for engineering and surveying services; (4) <br />approved Work Order No. 8 with Schulke, Bittle & <br />Stoddard for a total amount of $108,500.00, and (5) <br />authorized the Chairman to execute same, as <br />recommended in the memorandum of September 24, 2008. <br />WORK ORDER IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />13. COUNTY ATTORNEY MATTERS <br />B.A. POINTE WEST SOUTH VILLAGE. PHASE I P.D.. DEVELOPER: POINTE <br />WEST OF VERO BEACH. LTD.. DEFAULT UNDER SIDEWALK CONTRACT <br />County Attorney Collins reported that Pointe West South Village, which was in <br />default on a sidewalk contract, has requested an extension. They had hoped to have the <br />sidewalks completed before November 18, 2008; however, since the sidewalk construction is <br />two-thirds done, Pointe West needs the extension. Attorney Collins thereafter presented staff's <br />recommendation that the Board grant Pointe West the extension. He noted that Pointe West's <br />cash deposit will be refunded to them upon completion of the sidewalk. <br />44 <br />November 18, 2008 <br />