My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/1978
CBCC
>
Meetings
>
1970's
>
1978
>
12/20/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:09 AM
Creation date
6/11/2015 10:55:08 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/20/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />ON MOTION BY COMMISSIONER Loy, SECONDED BY COMMISSIONER <br />DEESON, THE BOARD UNANIMOUSLY DESIGNATED FIRST CITRUS BANK OF INDIAN <br />RIVER COUNTY AS THE DEPOSITORY FOR RECEIPT OF HUD, SECTION 8, EXISTING <br />RENTAL ASSISTANCE PROGRAM FUNDS, AND AUTHORIZED THE SIGNATURE OF THE <br />PROPER OFFICIALS. <br />ASSISTANT ADMINISTRATOR NELSON REVIEWED A LETTER WRITTEN BY <br />POST, BUCKLEY, SCHUH & JERNIGAN BREAKING DOWN THE COSTS INVOLVED IN <br />INSTALLING AN AIR -CURTAIN DESTRUCTOR AT THE SANITARY LANDFILL AND THE <br />BENEFIT TO BE DERIVED. THEIR LETTER IS HEREBY MADE A PART OF THE MINUTES, <br />AS FOLLOWS: <br />PP B POST, BUCKLEY, SCHUH & JERNIGAN. INC. <br />J ' ) 3191 MAGUIRE BOULEVARD, SUITE 101 CONSULT/NG ENGINEERS AND NN4' S&V „v <br />THE PORTERFIELD BUILDING CL R' <br />ORLANDO, FLORIDA 32803 t0 cr <br />TELEPHONE 306/8940041 sjs ' _z1l�j <br />November 30, 1978 <br />Mr. Neil Nelson, Ass't. Administrator <br />.Indian River County Courthouse <br />2145 Fourteenth Avenue <br />Vero Beach, Florida 32960 <br />Dear Neil: <br />As requested, the capital and 0 & M costs for <br />a proposed air -curtain <br />destructor to reduce combustible construction <br />debris and land clearing <br />wastes generated in Indian River County have <br />been estimated as follows: <br />CAPITAL COSTS <br />Materials <br />Air -Curtain Destructor (blower & plenum) <br />$ 9,860 <br />30 -Ft. Refractory -Lined Chamber <br />20,850 <br />Sub -Total" <br />$30,710 <br />Freight <br />11000 <br />Sub -Total <br />$31,710 <br />Sales Tax (4%) <br />Sub -Total <br />1.270 <br />$3'2;98U <br />Access Road <br />5,500 <br />Ramp <br />15,000 <br />Dragline <br />6,000 <br />Chain Saw <br />. 260 <br />. Total Material/Cost <br />$59 40 <br />BGS wnc <br />DEC 2®1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.