My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/24/1979
CBCC
>
Meetings
>
1970's
>
1979
>
1/24/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:38 AM
Creation date
6/11/2015 10:57:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/24/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE BOARD THEN ADJOURNED AT 12:05 O'CLOCK P.M. FOR LUNCH AND <br />RECONVENED AT 1:35 O'CLOCK P.M, WITH THE SAME MEMBERS PRESENT. <br />ADMINISTRATOR .JENNINGS NEXT DISCUSSED THE RESUME OF HERCULES <br />KONTOULAS WITH THE BOARD AND STATED THAT HE WOULD LIKE.TO HIRE HIM AS <br />THE CONSTRUCTION PROJECT REPRESENTATIVE FOR THE RENOVATING AND RECON- <br />STRUCTION WORK TO BE DONE ON THE HOSPITAL. HE NOTED THAT THOUGH WE HAVE <br />OUR CONSULTING ENGINEERS, HE FELT WE SHOULD HAVE OUR OWN REPRESENTATIVE <br />TO BE A DIRECT LIAISON BETWEEN THE CONSULTANTS AND THE COUNTY COMMISSIONERS <br />BECAUSE OF THE SIZE OF THE PROJECT. MR. KENNINGS STATED THAT SEVERAL <br />MEN HAVE BEEN INTERVIEWED BUT THAT HE WAS VERY MUCH IMPRESSED WITH MR, <br />KONTOULAS, WHO HAS DONE THE SAME TYPE OF WORK FOR THE SCHOOL BOARD. HE <br />INFORMED THE BOARD THAT MR. KONTOULAS HAS AGREED TO BE ON THE JOB ALL THE <br />TIME THAT THE WORK IS IN PROGRESS, EVEN IF IT REQUIRES WORKING ON SATUR- <br />DAYS, SUNDAYS OR AT NIGHT. THE ADMINISTRATOR CONTINUED THAT A SALARY <br />OF $17,000 FOR A YEAR ON A CONTRACTURAL BASIS WAS DISCUSSED, AND THIS <br />COULD BE EXTENDED MONTHLY IF DESIRED, WITH THE POSSIBILITY OF AN EARNED <br />RAISE TO $15,000 AFTER A YEAR. ADMINISTRATOR JENNINGS NOTED THAT THE <br />ONLY THINGS THE COUNTY WOULD FURNISH WOULD BE STATIONERY, AND SOME OFFICE <br />SPACE ON THE PROJECT AND HE FELT ANY SECRETARIAL WORK MR. KONTOULAS MIGHT <br />REQUIRE COULD BE DONE OUT OF THE ADMINISTRATOR'S OFFICE. <br />DISCUSSION ENSUED ABOUT THE TIMING FOR HIRING A CONSTRUCTION <br />PROJECT REPRESENTATIVE, AND COMMISSIONER SIEBERT POINTED OUT THAT WE MAY <br />BE MORE THAN A MONTH AWAY FROM GETTING INTO THE DESIGN PHASE, <br />THE ADMINISTRATOR STATED THAT HE WOULD PREFER TO GET SOMEONE <br />ON BOARD AHEAD OF TIME ON A JOB OF THIS SIZE, AND CHAIRMAN WODTKE AGREED, <br />NOTING THAT SOMEONE SUCH AS MR. KONTOULAS COULD BE HELPFUL IN ASSISTING <br />THE BOARD MAKE SOME DESIGN DECISIONS. HE POINTED OUT THAT A'GREAT DEAL <br />DEPENDS ON WHAT THE SCHOOL BOARD DECIDES. <br />COMMISSIONER LYONS FELT WE SHOULD GET A TENTATIVE DESIGN NOT <br />INCLUDING THE SCHOOL BOARD TO CONSIDER AS AN ALTERNATIVE. HE STATED THE <br />COUNTY'S NEEDS SHOULD BE DEALT WITH FIRST AND THEN SEE WHAT IS LEFT, <br />THE CHAIRMAN STATED THE CONSULTANTS HAVE BEEN ASKED TO DO THIS. <br />COMMISSIONER SIEBERT FELT COMMISSIONER.LOY'S SUGGESTION ABOUT <br />TAKING. ONE WING OF THE HOSPITAL AND TELLING THE SCHOOL BOARD WHAT IT <br />26 <br />JAN 24 1979 <br />
The URL can be used to link to this page
Your browser does not support the video tag.