Laserfiche WebLink
standards. <br />Director Boling introduced Items (4)(e)(1) — (3), regarding the unpaved haul route <br />Public Works Director Chris Mora responded to the Board's questions regarding <br />trip thresholds on the unpaved haul routes. <br />MOTION WAS MADE by Commissioner Wheeler, <br />SECONDED by Commissioner O'Bryan, to approve staff's <br />recommendation on Section #4, Item 4, Traffic and Nuisance <br />Mitigation, Items (4)(e)(1) through (4)(e)(3). <br />Mr. Schulke, P.E., 1717 Indian River Blvd., presented data regarding the number <br />of truck trips which could be accommodated on the haul route that would be built to Wild <br />Turkey Mines' specifications. He stated that truck traffic capacity could be increased by having <br />a minimum gradable base of twelve (12) inches of suitable road base material, plus an additional <br />twelve (12) inches of coquina. <br />Extended discussion ensued between Commissioners, staff, area residents, and <br />area professionals, regarding matters pertaining to the trip capacity of the unpaved haul routes. <br />The Chairman CALLED THE QUESTION, and by a 4-0 <br />vote (Chairman Davis recused himself), the Board approved <br />staff's recommendation on Section #4, Item (4) Traffic and <br />Nuisance Mitigation, Item (4)(e)(1) through (4)(e)(3). <br />16 <br />December 19, 2008 <br />Special Call Mining Regulations <br />