My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/21/1979
CBCC
>
Meetings
>
1970's
>
1979
>
2/21/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:38 AM
Creation date
6/11/2015 11:00:24 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/21/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$33 PER SQ. FT. AND THAT WE SHOULD GIVE THE SCHOOL BOARD A FIGURE OF <br />$35 PER SQ. FT. AND THEN HOLD IT TO THAT IF WE HAVE TO CUT BACK TO DO IT. <br />MR. NELSON FELT THAT IS A GOOD SOLID FIGURE AND WE CAN CONTROL <br />IT. <br />CHAIRMAN WODTKE PREFERRED A FIGURE OF $30, BUT IT WAS POINTED <br />OUT THAT WHILE YOU CAN ALWAYS COME DOWN, YOU CAN T GO UP. <br />MR. KONTOULAS REMINDED THE BOARD THAT THE ARCHITECT`S FEE AND <br />THE LANDSCAPING IS NOT INCLUDED IN THE $30 PER SQ. FT. FIGURE, AND, IN <br />ADDITION, MAINTENANCE OF THE BUILDING IS A FACTOR. MR, KONTOULAS CON- <br />TINUED THAT, ON THE POSITIVE SIDE, YOU MUST TAKE INTO CONSIDERATION THE <br />LAND OBTAINED ALONG WITH THE PURCHASE OF THE HOSPITAL AND THE FACT THERE <br />IS SOME SALVAGE VALUE. HE FELT THE COUNTY IS BETTER OFF RENOVATING THAN <br />THEY EVER WOULD HAVE BEEN TO CONSIDER A NEW BUILDING SINCE CONSTRUCTION <br />COSTS FOR OFFICE BUILDINGS CAN RUN AS HIGH AS $75 PER SQ, FT. <br />IT WAS GENERALLY AGREED TO APPROACH THE SCHOOL BOARD WITH A <br />FIGURE OF $35 PER SQ, FT. THE CHAIRMAN ASKED IF WE WILL CONSIDER 30 YEARS <br />ON THE BOND, AND THE COORDINATOR DID NOT.FEEL WE SHOULD MAKE THAT DECISION <br />YET. <br />MR. NELSON STATED THAT HE BELIEVES THE SCHOOL BOARD WANTS A <br />MINIMUM OF 21,000 SQ. FT., ANIJ COORDINATOR THOMAS FELT THAT IS WITHIN THE <br />$50,000-$60,000 RANGE. THE FINANCE OFFICER AGREED THAT AT 6% IT IS RIGHT <br />AT $60,000 ANNUALLY. <br />ASSISTANT ADMINISTRATOR NELSON INQUIRED IF THE BOARD WISHED <br />TO HAVE A WORKSHOP MEETING WITH REPRESENTATIVES FROM CONNELL, METCALF & <br />EDDY OR JUST HAVE ONE COMMISSIONER MEET WITH THEM. <br />COMMISSIONER Loy STATED THAT SHE FELT IT WOULD BE TOO DIFFICULT <br />FOR ONE COMMISSIONER BECAUSE THERE ARE JUST TOO MANY QUESTIONS. <br />COMMISSIONER LYONS ASKED IF THEY ARE THINKING ABOUT A CITIZENS <br />COMMITTEE, AND CHAIRMAN WODTKE FELT A COMMISSIONER SHOULD BE ASSIGNED TO <br />THE PROJECT WHO WOULD HAVE THE AUTHORITY TO UTILIZE THE EXPERTISE OF <br />SOMEONE SUCH AS .JACK DRITENBAS. <br />COMMISSIONER LYONS INFORMED THE BOARD THAT HE KNOWS OF A MAN <br />WHO WAS CONSTRUCTION ENGINEER WITH UNION CARBIDE AND HAS EXPERIENCE IN <br />63 <br />FEB 2 11979 <br />BOOK 39 PAGE 144 <br />
The URL can be used to link to this page
Your browser does not support the video tag.