Laserfiche WebLink
<br /> <br />7.G. WP.D.,P2,RD, <br />OODFIELD HASE EQUEST FROM EVELOPER <br />C/LW,LLCE <br />ENTEX ENNAR AT OODFIELD FOR AN XTENSION TO <br />CRI <br />OMPLETE EQUIRED MPROVEMENTS <br />Commissioner Flescher was concerned that if the developer was so close to <br />completion why they needed an extension. After Engineer Joseph Schulke gave a project <br />status report and Attorney Collins clarified that the extension was already granted to the <br />Letter of Credit in contemplation that the contract would be extended, Commissioner <br />Flescher gave his support. <br /> <br />MOTION WAS MADE by Commissioner Flescher, <br />to extend the Letter of Credit for a three-month <br />period. There was no Second. Motion DIED. <br /> <br />ON MOTION by Commissioner Davis, SECONDED <br />by Commissioner O’Bryan, by a 4-1 vote (Chairman <br />Wheeler opposed) the Board approved the <br />Modification to Contract for Construction of <br />Required Improvements No. PD-03-04-11-CFCPH2 <br />(2002120063-48453) for Woodfield P.D., Phase 2, <br />provided that each existing SunTrust Bank Letter of <br />Credit be amended to extend the expiration date to <br />September 5, 2007 which is 90 days beyond the June <br />5, 2007 requested extension date; and authorized the <br />Chairman to execute the Modification. The <br />amendment to the letter of credit must be received no <br />later than 12:00 noon on Tuesday, December 5, 2006 <br />December 5, 2006 <br />5 <br /> <br />