Laserfiche WebLink
<br />CLERK’S NOTE: Chairman Ginn requested and received agreement to move Item <br />8.A. ahead of Item 5.D. These minutes have been written in the order the items appeared <br />on the agenda. <br /> <br /> <br />5.D. PJGS1&2 <br />RESENTATION BY ONATHAN ORHAM ON THE ECTORS <br />MRP <br />ITIGATION EEF ROJECT <br /> <br />Coastal Resource Manager Jonathan Gorham introduced the presenter James Gray <br />from the County’s Coastal Engineering Division. <br />Coastal Engineer James Gray reviewed a PowerPoint outline showing our location, <br />design, and proposed construction plan, as well as aerial color photographs of a similar reef <br />project at the South Inlet Park in Boca Raton. Construction is anticipated to begin in May <br />with completion expected by early September. The contractor is Wilkinson and Jenkins <br />Construction and the project cost will be $4,216,000 with 74% paid by the State of Florida <br />and 26% local funding. This 5.2-acre limestone reef will be about 1,500 feet south of South <br />Beach Park about 600 feet offshore in water about 15-18 feet deep. (A copy of the <br />presentation is on file with the backup in the office of the Clerk to the Board.) <br /> <br /> <br />6.A. APPROVAL OF MINUTES <br />None. <br /> <br />7. CONSENT AGENDA <br />7.A. R <br />EPORTS <br />1. Report of Convictions, December, 2003 <br />February 3, 2004 4 <br /> <br />