My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/6/1979
CBCC
>
Meetings
>
1970's
>
1979
>
6/6/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:38 AM
Creation date
6/11/2015 11:03:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/06/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAIRMAN WODTKE STATED THAT HE DID NOT KNOW WHETHER THE BOARD <br />WANTS HIM, ATTORNEY COLLINS AND ENGINEER BEINDORF TO CONTINUE TO DISCUSS <br />THIS MATTER WITH MR. SALTER OR JUST SIT BACK AND SEE WHAT HAPPENS, <br />COMMISSIONER LYONS DID NOT FEEL WE WANT TO TAKE OVER ANY <br />SEWER PLANT FOR MR. SALTER IS BENEFIT UNTIL WE GET IN A POSITION TO BE <br />IN THE SEWER BUSINESS. <br />CHAIRMAN WODTKE NOTED THAT WE ARE TALKING ABOUT POSSIBLY <br />INCORPORATING TREASURE COAST UTILITIES IN A SOUTH COUNTY WATER PLANT, <br />AND EXPRESSED CONCERN ABOUT SUPPLYING WATER BUT NOT TAKING OVER SEWER. <br />IN GENERAL DISCUSSION, THE BOARD FELT WE SHOULD SIT BACK AND <br />SEE WHAT HAPPENS AND THINK ABOUT THIS FOR A WHILE. <br />CHAIRMAN WODTKE NEXT BROUGHT UP BARBER AVE, AND STATED THAT <br />WHEN MR. SIMPSON OF KUNDE, DRIVER & SIMPSON WAS HERE, HE ASKED HIM <br />ABOUT A POSSIBLE.TIME FRAME IN WHICH WE FEEL WE WILL GO TO BID. <br />ADMINISTRATOR KENNINGS STATED THAT HE HAS TALKED TO MR. SIMPSON <br />TODAY, AND MR. SIMPSON HAS RECEIVED WORD FROM THE DER IN ORLANDO THAT <br />THEY ARE NOT GOING TO REQUIRE THEM TO GO THROUGH THE PERMITTING PROCESS <br />FOR BARBER AVE. BECAUSE OF THE DRAINAGE BEING TAKEN CARE OF IN INDIAN <br />RIVER BOULEVARD. THEY ARE TO SEND HIM A LETTER CONFIRMING THIS. IN <br />THE EVENT HE DOESN'T RECEIVE THAT LETTER BY NEXT WEEK, THEN HE WILL <br />WRITE THEM REFERRING TO THE TELEPHONE CONVERSATION AND TELLING THEM WE <br />ARE MOVING ALONG BASED ON THAT UNDERSTANDING. THE ADMINISTRATOR STATED <br />THAT THE SPECIFICATIONS AND CONTRACT DOCUMENTS SHOULD BE HAND DELIVERED <br />TO HIS OFFICE EARLY NEXT WEEK, AND IF ALL THINGS WORK OUT, WE COULD BE <br />READY TO AWARD THE CONTRACT POSSIBLY BY AUGUST LOTH, ADMINISTRATOR <br />KENNINGS CONTINUED THAT HE AND COMMISSIONER LYONS HAVE NOT BEEN TO <br />TALLAHASSEE ON INDIAN RIVER BOULEVARD. HE NOTED IF WE CAN GET SOME <br />APPROVAL ON TIE-IN OF INDIAN RIVER BOULEVARD TO BARBER AVE., WE -CAN <br />ALTER THE BARBER AVE. PLAN TO STOP AT THAT POINT. HE WOULD PREFER TO <br />HAVE THE PLAN RIGHT TO START WITH. <br />COMMISSIONER LOY ASKED IF WE MIGHT BE BETTER OFF T.0 JUST LET <br />THE SPECIFICATIONS. MAKE BARBER AVE. A LITTLE LONGER, AND THE ADMINIS- <br />TRATOR STATED THAT HE WOULD PREFER TO HAVE IT THE OTHER WAY AND SHORTEN <br />BARBER -AVE. <br />JUN 0,1979 BOOK �® E443 <br />
The URL can be used to link to this page
Your browser does not support the video tag.