My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/20/1979
CBCC
>
Meetings
>
1970's
>
1979
>
6/20/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:39 AM
Creation date
6/11/2015 11:04:19 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/20/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />SIEBERT, THE BOARD UNANIMOUSLY APPROVED THE PROPOSED CONTRACT WITH THE <br />.JOINT VENTURE ON BRIDGE INSPECTION ON'A COST PLUS SITUATION, USING <br />-$77,920 AS AN UP -SHOT FIGURE FOR THE 88 BRIDGES, AND $11,000 FOR THE <br />WABASSO BRIDGE, AND PUTTING A TEMPORARY HOLD ON THE WABASSO BRIDGE. <br />SAID CONTRACT WILL BE MADE A PART OF THE MINUTES WHEN FULLY <br />EXECUTED. <br />ADMINISTRATOR .JENNINGS ASKED PERMISSION TO ADD DISCUSSION OF <br />THE RELOCATION OF THE SEWAGE TREATMENT PLANT IN GIFFORD TO THE AGENDA. <br />ON MOTION BY COMMISSIONER Loy, SECONDED BY COMMISSIONER LYONS, <br />THE BOARD UNANIMOUSLY APPROVED THE EMERGENCY ITEM REQUESTED BY ADMINISTRA- <br />TOR JENNINGS TO TODAY'S AGENDA. <br />.JOHN ROBBINS, OF THE .JOINT VENTURE, NOTED THAT THEY HAD RE- <br />CEIVED AUTHORIZATION TO CARRY OUT THE RELOCATION OF THE SEWAGE PLANT <br />FROM ITS PRESENT SITE TO KINGS HIGHWAY. (THE DEVELOPER WHO DONATED THIS <br />PLANT NEEDS THE LAND AND REQUESTED THE PLANT BE MOVED.) HE STATED THAT <br />THEY PUT THIS JOB OUT FOR BID AND ESTIMATED A COST OF BETWEEN $10,000 <br />TO $20,000 FOR THE RELOCATION. THEY RECEIVED A LOW -BID OF $11,009 FROM <br />ASHTON UTILITIES OF FORT PIERCE, WITH THE SECOND LOWEST BEING $16,900 <br />FROM SUNSHINE UTILITY EQUIPMENT.' THIS COST IS INCLUDED AS PART OF THE <br />.JOINT VENTURE'S SERVICES, MR. ROBBINS NOTED THAT THEY WILL HAVE TO <br />CALL FOR BIDS ON REINSTALLATION OF THE PLANT. <br />ATTORNEY COLLINS COMMENTED THAT SOME OF THE PERISHABLE PORTIONS <br />OF THE PLANT ARE IN STORAGE AND ASKED IF THEY NEEDED COMMISSION APPROVAL <br />TO GET THEM OUT OF STORAGE. MR. ROBBINS RESPONDED THAT EVENTUALLY THEY <br />WILL, BUT NOT AT THIS TIME. <br />MR. ROBBINS THEN DISTRIBUTED TO THE BOARD THE PROPOSED SCOPE <br />OF WORK FOR IMPROVEMENTS TO THE PEBBLE BAY AREA SEWAGE COLLECTION AND <br />PUMPING SYSTEM FOR CONNECTION TO THE CITY OF VERO BEACH SEWERAGE SYSTEM, <br />A COPY OF WHICH IS MADE A PART OF THE MINUTES, AS FOLLOWS: <br />32 <br />J U N 2 0 1979 Bao .41 PAUE 3Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.