My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/5/1979
CBCC
>
Meetings
>
1970's
>
1979
>
7/5/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:39 AM
Creation date
6/11/2015 11:05:02 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/05/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f) determine condition of bridge approaches <br />g) perform underwater inspection as required <br />D. "Preparation of Bridge Report <br />1. A report will be prepared for each bridge inspected <br />utilizing the format of the Florida Department of Transportation Type II <br />Bridge Inspection Report. <br />2. Each bridge report will include the following elements: <br />a) location map with structure designation number <br />b) general bridge condition <br />c) current condition of bridge <br />d) structure deficiencies <br />e) load capacities of bridge <br />f) recommendations for improvements if required <br />g)• estimated cost of required improvements <br />p h) summary <br />i) photographs will be included as necessary for <br />pictorial documentation. <br />j) copy of the completed Florida Department of <br />Transportation's Structure Inventory and Appraisal <br />Form <br />3. One copy of each bridge report will be submitted to <br />the Owner for the Owner's record. One copy of each Structure Inventory and <br />Appraisal form (in addition to the Structure Inventory and Appraisal form <br />included in the report) will be submitted to the Owner. Copies of the bridge <br />reports and supporting data will be submitted to the Owner on a monthly basis. <br />4. The Engineer shall complete the work as outlined <br />under Section 1. Basic Services of the Engineer, within five (5) months of <br />the date of execution of this Agreement. <br />SECTION 2. RESPONSIBILITY OF THE OWNER , <br />.The Owner will: <br />A. Provide full information as to the Owner's requirements for <br />the work. <br />3 <br />J U L 5 1979 BOOK 41 £AvE 133 <br />
The URL can be used to link to this page
Your browser does not support the video tag.