Laserfiche WebLink
V <br />Payment Schedule <br />Payment to the Engineer shall be the total payroll cost of salaries <br />and wages for personnel assigned to the Project, times a factor of 2.1 to provide <br />for general overhead and profit, plus the actual cost of reimbursable expenses <br />as defined hereinafter. <br />The payroll cost of salaries and wages used.as a basis for payment <br />shall mean the cost of salaries and wages paid to principals and employees engaged <br />directly on the Project, including, but not limited to, engineers, architects, <br />surveymen, designers, draftsmen, specification writers, estimators, stenographers <br />and clerks, plus cost of fringe benefits including, but not limited to, social <br />security contributions, unemployment, excise and payroll taxes, workmen's com- <br />pensation, health and retirement benefits, pensions, sick leave, vacation, and <br />holiday pay applicable thereto. <br />Reimbursable expenses shall mean the actual expense of transporta- <br />tion and subsistence of principals and employees when traveling in connection <br />with the Project, field office expenses, resident Project representative's <br />subsistence and transportation, toll telephone calls and telegrams, reproduction <br />of reports, drawings and specifications, and similar Project related items. <br />1. For the bridges located as shown on Attachment "A" (up to 88 <br />bridges), an amount not to exceed $77,920.00 without Owner's authorization. <br />2. For the high-level Wabasso bridge, an amount not to exceed <br />$11,000.00 without Owner's authorization. <br />E <br />Compensation for services provided for Under Section 3, Additional <br />Engineering Services, -as required, will be equitably negotiated between the <br />Owner and Engineer prior to the issuances of written authorization by the Owner. <br />SECTION 5_ GENERAL CONSIDERATIONS <br />A. Ownership of Documents <br />All original tracings, plans, specifications, and maps pre- <br />pared under this Agreement shall become the property of the Owner. Also, <br />basic surveys, notes and sketches, charts, computations and other data will be <br />made -available, upon request, to the Owner without restriction or limitation on <br />their use. In the event of such use, however, the name plates will be removed <br />and the Engineer is.released and held harmless of subsequent liabilities. <br />B. Estimates <br />Since the Engineer has no control over the cost of labor and <br />materials, or over competitive bidding and market conditions, the estimates on <br />construction cost provided for the work are to be made on the basis of his ex- <br />perience and qualifications but the Engineer does not guarantee the accuracy <br />of such estimates as compared to the Contractor's bids or the work construction <br />costs. <br />A <br />J U L 51979 Bou 41 ?Acf 135 <br />