V
<br />Payment Schedule
<br />Payment to the Engineer shall be the total payroll cost of salaries
<br />and wages for personnel assigned to the Project, times a factor of 2.1 to provide
<br />for general overhead and profit, plus the actual cost of reimbursable expenses
<br />as defined hereinafter.
<br />The payroll cost of salaries and wages used.as a basis for payment
<br />shall mean the cost of salaries and wages paid to principals and employees engaged
<br />directly on the Project, including, but not limited to, engineers, architects,
<br />surveymen, designers, draftsmen, specification writers, estimators, stenographers
<br />and clerks, plus cost of fringe benefits including, but not limited to, social
<br />security contributions, unemployment, excise and payroll taxes, workmen's com-
<br />pensation, health and retirement benefits, pensions, sick leave, vacation, and
<br />holiday pay applicable thereto.
<br />Reimbursable expenses shall mean the actual expense of transporta-
<br />tion and subsistence of principals and employees when traveling in connection
<br />with the Project, field office expenses, resident Project representative's
<br />subsistence and transportation, toll telephone calls and telegrams, reproduction
<br />of reports, drawings and specifications, and similar Project related items.
<br />1. For the bridges located as shown on Attachment "A" (up to 88
<br />bridges), an amount not to exceed $77,920.00 without Owner's authorization.
<br />2. For the high-level Wabasso bridge, an amount not to exceed
<br />$11,000.00 without Owner's authorization.
<br />E
<br />Compensation for services provided for Under Section 3, Additional
<br />Engineering Services, -as required, will be equitably negotiated between the
<br />Owner and Engineer prior to the issuances of written authorization by the Owner.
<br />SECTION 5_ GENERAL CONSIDERATIONS
<br />A. Ownership of Documents
<br />All original tracings, plans, specifications, and maps pre-
<br />pared under this Agreement shall become the property of the Owner. Also,
<br />basic surveys, notes and sketches, charts, computations and other data will be
<br />made -available, upon request, to the Owner without restriction or limitation on
<br />their use. In the event of such use, however, the name plates will be removed
<br />and the Engineer is.released and held harmless of subsequent liabilities.
<br />B. Estimates
<br />Since the Engineer has no control over the cost of labor and
<br />materials, or over competitive bidding and market conditions, the estimates on
<br />construction cost provided for the work are to be made on the basis of his ex-
<br />perience and qualifications but the Engineer does not guarantee the accuracy
<br />of such estimates as compared to the Contractor's bids or the work construction
<br />costs.
<br />A
<br />J U L 51979 Bou 41 ?Acf 135
<br />
|