My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2007 (3)
CBCC
>
Meetings
>
2000's
>
2007
>
03/20/2007 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 3:12:00 PM
Creation date
10/1/2015 6:12:42 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
03/20/2007
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
3130
Book and Page
132, 563-610
Supplemental fields
SmeadsoftID
3087
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.A.4. DEMOLITION OF VARIOUS STRUCTURES LOCATED AT 5900 5TH <br />STREET SW <br />Director Keating presented this item as a continuation from the February 20, 2007 <br />meeting where the Board tabled action and requested Mr. Legwen to provide information prior to <br />the Board making a decision to delay demolition. <br />Glenn Legwen, 5900 5th Street, S.W., expressed that his buildings were not <br />"residence storage" structures but "farm" structures. He said he consulted with three engineering <br />firms for a proposed plan to salvage the structures, bring them up to code and obtain an estimated <br />cost. He was still evaluating the information to decide if it would be advantageous to repair or <br />demolish the buildings. Should he decide to bring them up to code, he said he would apply for a <br />permit within two weeks. He informed the Board that he had removed two of the five buildings <br />since February. Mr. Legwen wanted the Board to remove the demolition order. <br />Commissioner Davis did not want to remove the demolition order, however, he was <br />willing to give Mr. Legwen two more weeks. <br />Vice Chair Bowden said she would support that idea as long as Mr. Legwen would <br />show progress. <br />Commissioner Flescher said the project was becoming fatiguing and since he did not <br />see much progress he would not support another two weeks. <br />Commissioner O'Bryan asked to see the engineering plans that Mr. Legwen was <br />instructed to come back with and requested staff to review the plans before he gave his position. <br />March 20, 2007 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.