Laserfiche WebLink
11.A.4. DEMOLITION OF VARIOUS STRUCTURES LOCATED AT 5900 5TH <br />STREET SW <br />Director Keating presented this item as a continuation from the February 20, 2007 <br />meeting where the Board tabled action and requested Mr. Legwen to provide information prior to <br />the Board making a decision to delay demolition. <br />Glenn Legwen, 5900 5th Street, S.W., expressed that his buildings were not <br />"residence storage" structures but "farm" structures. He said he consulted with three engineering <br />firms for a proposed plan to salvage the structures, bring them up to code and obtain an estimated <br />cost. He was still evaluating the information to decide if it would be advantageous to repair or <br />demolish the buildings. Should he decide to bring them up to code, he said he would apply for a <br />permit within two weeks. He informed the Board that he had removed two of the five buildings <br />since February. Mr. Legwen wanted the Board to remove the demolition order. <br />Commissioner Davis did not want to remove the demolition order, however, he was <br />willing to give Mr. Legwen two more weeks. <br />Vice Chair Bowden said she would support that idea as long as Mr. Legwen would <br />show progress. <br />Commissioner Flescher said the project was becoming fatiguing and since he did not <br />see much progress he would not support another two weeks. <br />Commissioner O'Bryan asked to see the engineering plans that Mr. Legwen was <br />instructed to come back with and requested staff to review the plans before he gave his position. <br />March 20, 2007 24 <br />