My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/8/1979
CBCC
>
Meetings
>
1970's
>
1979
>
8/8/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:39 AM
Creation date
6/11/2015 11:09:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/08/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAIRMAN WODTKE EXPLAINED THAT BASICALLY THE OPTIONS WE HAVE <br />BEEN PRESENTED ARE FOR THE COUNTY TO RUN THE LINE WEST ON NORTH GIFFORD <br />ROAD UNDERNEATH 43RD AVENUE AND THEN TO EXTEND A 2" SERVICE LINE DOWN <br />TO THE AREA WHERE THE SCHOOL WOULD CONNECT. THE COST OF RUNNING A 2" <br />LINE FROM 43RD DOWN TO THE SCHOOL AMOUNTED TO $3,000. IT WAS THE <br />RECOMMENDATION OF THE CONSULTANTS AND'THE ADMINISTRATOR AND THE CHAIRMAN <br />THAT WE CONSIDER ENLARGING THE LINE TO A 6" LINE WHICH WOULD GIVE US THE <br />NECESSARY SIZE TO PUT IN A FIRE HYDRANT AT THAT LOCATION. THEY TOOK <br />THE COST OF THE OVERSIZING AND THE FIRE HYDRANT AND SPLIT IT WITH THE <br />SCHOOL BOARD, AND THE SCHOOL BOARD CAME UP WITH THEIR FIGURE OF $5,500. <br />CHAIRMAN WODTKE FELT THIS IS A SERVICE WE SHOULD PROVIDE, IF POSSIBLE, <br />AND THAT WE SHOULD AUTHORIZE THE NECESSARY CHANGE ORDER. <br />ENGINEER RICHARD VOTAPKA STATED THAT THESE ARE EXISTING UNIT <br />PRICES AND HE WILL HAVE TO CHECK THIS WITH THE CONTRACTOR. HE INFORMED <br />THE BOARD THAT CHAPMAN CONSTRUCTION COMPANY WILL FINISH EARLY IN SEPTEMBER <br />OR THE LAST WEEK IN AUGUST AND THEN THEY COULD GO RIGHT INTO THIS PROJECT <br />AND DO IT IN A REASONABLY SHORT PERIOD OF TIME. <br />CHAIRMAN WODTKE NOTED THAT THE SCHOOL BOARD NEEDS THIS AS <br />SOON AS POSSIBLE, AND HE HAD HOPED IT COULD BE COMPLETED WITHIN THE NEXT <br />THREE WEEKS. <br />ON MOTION BY COMMISSIONER SIEBERT, SECONDED BY COMMISSIONER <br />Loy, THE BOARD UNANIMOUSLY AUTHORIZED CHANGE ORDER #2 AS RECOMMENDED BY <br />THE ADMINISTRATOR AND THE CONSULTING ENGINEER TO PROVIDE WATER TO <br />CLEMANS ELEMENTARY SCHOOL, BY MEANS OF A 6" LINE AND INCLUDING A FIRE <br />HYDRANT, AND ACCEPTED THE PROPOSAL OF THE SCHOOL BOARD TO REIMBURSE THE <br />COUNTY APPROXIMATELY $5,500, I.E. HALF THE COST OF OVERSIZING THE LINE <br />AND PROVIDING THE FIRE HYDRANT. <br />PLANNING DIRECTOR REVER CAME BEFORE THE BOARD IN REGARD TO THE <br />CONTRACTS FOR PROFESSIONAL CONSULTING SERVICES AND SCOPE OF SERVICES FOR <br />STUDY OF THE SPOIL ISLANDS. THERE ARE TWO CONTRACTS - ONE FOR GRANT <br />GILMORE AS CONSULTANT AND ONE FOR TREASURE COAST REGIONAL PLANNING COUNCIL <br />AS MANAGEMENT CONSULTANT. MR. REVER NOTED THAT THERE WERE SOME MINOR <br />CHANGES MADE. ON THE CONTRACT WITH GRANT GILMORE, ON THE FIRST PAGE, <br />AUG 81979 BOOK 41 PACE316 <br />73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.