Laserfiche WebLink
SEP 19 1979 <br />August G, 1979 <br />100 <br />TO: Jack G. Jennings, County Administrator <br />FROMjyd David Marsh, Planner <br />SUBJECT: Wabasso Beach Park Improvements <br />Bom 41 FAUE546 <br />The following represents a summary of the Planning Department recommendations <br />with respect to the proposals submitted by the North County group with which <br />we met, and additionally the initial recommendations contained in the July 26, <br />1979 demo to Neil Nelson (see attached copy). <br />1) Existing poles along bluff line be relocated approximately 50 feet <br />west. Parking to still be allowed along the new hedge row. <br />2) Boardwalk to be placed approximately 10 - 12 feet behind the bluff <br />line with dune vegetation being spotted around the walkway and <br />crossovers, and also along the hedge row. <br />3) Parking be restricted from existing southern picnic area and also <br />the northern area which is slated for future improvements. <br />4) That unless a more suitable location is found, the proposed relief <br />station/storage building be situated in a central location easily <br />accessible to both existing and proposed picnic areas. If permitting <br />is possible, the proposed relief station/storage building could be <br />located farther to the east abutting the coastal setback line. A <br />9-0 X 20 building should be adequate. The proposed playground unit <br />could be relocated to the north picnic area which would allow more <br />parking area. <br />5) Should the fencing be removed from the park perimeter, that pro- <br />visions be made to install either a vandal proof facility or secure <br />the immediate area with fencing. <br />Adequate funds for both the general upgrading with boardwalk -crossovers and <br />revegetation, and the proposed relief station, are not currently budgeted. <br />As indicated in the July 26, 1979 memo to Neil Nelson, the proposed Phase I <br />improvement program does not include provisions for the requested relief <br />station. Thus additional funds need to be sought if the relief station is <br />to be constructed. The elimination of proposed boardwalk -crossovers and <br />4 <br />L —1 <br />