My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/1979
CBCC
>
Meetings
>
1970's
>
1979
>
9/5/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:39 AM
Creation date
6/11/2015 11:11:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/05/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />SEP 191979 <br />POOK 4 1 FAUE 548 7 <br />• ; 14ABASSO DEVELOPMENT PLAN <br />Proposed.Phase I Improvements - July 26, 1979 <br />Fencing (already installed) $ 5,300.00 <br />Boar&aalk and crossovers (2) @ 5.00 sq. ft. X 2500 sq. ft. 12,500.00 <br />Gazebo @ 8.00 sq. ft. X 200 sq. ft. 11600.00 <br />Top Soil and Sod 21000.00 <br />lants and shrubs) 2,x00.00 <br />' Landscaping (p . <br />Railroad ties and/or poles 1$00.00 <br />Paint and hardware., ctc. - 600.00 <br />Resurface existing road (22 ft.) "0' <br />$ 26,000.00 <br />'.(It should be noted that restroom and shower facilities, barbeque <br />-grills.and a new life guard tourer are needed as soon as possible.) <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.