Laserfiche WebLink
OCT 16 1979 <br />. 1 w,)r 745 <br />COMMISSIONER SIEBERT ASKED -IF WE REALLY NEED TO DISCUSS <br />THE MERITS OF THE DEEP WATER AQUIFER OR THE SHALLOW, AND MR. <br />BEINDORF STATED ONLY IF THE BOARD WISHED TO. <br />IN FURTHER DISCUSSION, IT WAS GENERALLY AGREED THAT WE WILL <br />HAVE TO GO TO REVERSE OSMOSIS AND THE DEEP WATER AQUIFER, <br />COMMISSIONER SIEBERT WAS CONCERNED THAT THE PROJECTED <br />OPERATING AND MAINTENANCE COSTS THAT HAVE TO BE AMORTIZED MAY BE <br />FAR TOO LOW IF THE COST OF ENERGY DOUBLES. <br />.JOHN ROBBINS NOTED THAT IN DEVELOPING A METHOD OF PAYMENT <br />BACK, THEY TOOK -A LOOK AT THE OPERATION AND MAINTENANCE COST ON THE <br />AVERAGE -DAY OF THE SYSTEM, AND EACH TIME YOU ADD A CONNECTION, YOU <br />HAVE EFFECTIVELY PUT MORE OPERATION AND MAINTENANCE FUNDS INTO THE <br />SYSTEM. HE STATED THAT WITH 2,500 CONNECTIONS, WE HAVE ENOUGH 0 M <br />MONEY SET ASIDE, AND AS THE RESERVE CONNECTIONS ARE USED UP, MORE <br />0 & M FUNDS ARE GENERATED, <br />CHAIRMAN WODTKE FELT THAT ONE OF THE CONCERNS IS THAT <br />REVERSE OSMOSIS PLANTS OF THIS SIZE ARE RELATIVELY NEW. NE NOTED <br />THAT THEY ONE THEY VISITED IN CAPE CORAL, WHICH HE BELIEVED WAS THE <br />FIRST ONE IN FLORIDA OF THAT MAGNITUDE, HAD SOME PROBLEMS. <br />.JOHN ROBBINS INFORMED THE BOARD THAT THERE IS A ONE MGD <br />REVERSE OSMOSIS PLANT IN VENICE, FLORIDA, WHICH HAS BEEN IN OPERA- <br />TION FOR TEN YEARS. <br />RALPH ENG STATED THAT IF THIS REPORT HAD BEEN DONE FIVE <br />YEARS AGO, THEY WOULD NOT HAVE RECOMMENDED REVERSE OSMOSIS, BUT <br />NOW THEY CAN FEEL COMFORTABLE WITH IT SINCE THE TECHNOLOGY IS PRO- <br />GRESSING. <br />MOTION WAS MADE BY COMMISSIONER SIEBERT, SECONDED BY <br />COMMISSIOENR Loy, TO ADOPT THE PRELIMINARY ENGINEERING REPORT FOR <br />WATER SYSTEM IMPROVEMENT FOR THE SOUTH COUNTY MUNICIPAL TAXING <br />DISTRICT AND THE RECOMMENDATIONS THEREIN FOR THE REVERSE OSMOSIS <br />SYSTEM. <br />DISCUSSION AROSE ABOUT GOING INTO TEST WELLS, AND RALPH <br />ENG FELT THAT THE COMMISSION NEEDS TO HAVE THEM PREPARE A SET OF <br />GUIDELINES AND CRITERIA FOR THE TEST WELL PROGRAM FOR THEIR REVIEW <br />AND THEN WE CAN GET A PROPOSAL ON THE TEST WELL PROGRAM. <br />