Laserfiche WebLink
(1) Prior to site plan release, the applicant shall submit cut <br />sheets (or design cross-sections) of all outdoor light <br />fixtures, including wall -mounted lights and parking lot <br />lights. All outdoor lights shall comply with SR 60 Corridor <br />light shielding requirements; <br />(2) Prior to issuance of a Certificate of Occupancy (C.O.) <br />for Phase 1, the applicant shall: <br />(2.A) Construct a westbound right turn lane at the project <br />entrance, as shown on the approved site plan; <br />(2.13) Construct the 4th Street roadway widening <br />improvements, as shown on the approved site plan; <br />(2.C) Install all required landscape buffers and opaque <br />features for the entire site, as shown on the project's <br />landscape plan; and <br />(3) Prior to issuance of building permits for Phase 2, the <br />applicant shall submit traffic counts and actual Phase 1 trip <br />data to Traffic Engineering and provide an eastbound left <br />turn land at the project entrance if such data show that the <br />turn lane is required under County land development <br />regulations, as recommended in the memorandum of April <br />17, 2008. <br />The Chairman called a recess at 12:10 p.m. and reconvened the meeting at 12: 22 p.m. with <br />all members present (Vice Chairman Davis absent). <br />12 <br />April 29, 2008 <br />