My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/01/2007
CBCC
>
Meetings
>
2000's
>
2007
>
05/01/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 3:38:40 PM
Creation date
10/1/2015 6:07:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Meeting
Document Type
Implementation
Meeting Date
05/01/2007
Meeting Body
Board of County Commissioners
Supplemental fields
SmeadsoftID
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. <br />Utilities Services <br />1. 27th Drive Petition Water Service (North of 4th Street), Indian River <br />County Project No. UCP — 2906, Preliminary Assessment <br />Resolutions I and II <br />(memorandum dated April 13, 2007) <br />368-381 <br />Approved Resolution #2007-041 which approved the preliminary <br />assessment roll and established a public hearing for May 22, <br />2007, by Resolution #2007-042. <br />2. Work Order No. 4 with Schulke, Bittle & Stoddard, LLC for Design <br />of Master Plan Water Main, Vero Lake Estates, UCP — 2958 <br />(memorandum dated April 18, 2007) <br />382-399 <br />Approved Work Order No. 4 with Schulke, Bittle & Stoddard in <br />the amount of $154,300. for services including surveying, <br />geotechnical exploration, engineering design, hydraulic <br />analysis/modeling, preparing construction plans, permitting, <br />bidding and construction services. <br />3. Construction of the Rockridge Sewer System — UCP#2521 <br />(memorandum dated April 10, 2007) 400-415 <br />Approved award of Bid #2007040 to Giannetti Contracting of <br />Florida, in the amount of $5,782,621. with partial funding <br />through a State Community Development Block Grant of <br />$1,619,500; $2,100,000 for flood control transferred to the Sewer <br />Project; and an additional $3,000,000 is pending through a <br />FEMA Disaster Recovery Grant. <br />May 1, 2007 Page 12 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.