My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/13/2008 (2)
CBCC
>
Meetings
>
2000's
>
2008
>
05/13/2008 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2022 10:50:52 AM
Creation date
10/1/2015 6:14:27 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda
Meeting Date
05/13/2008
Meeting Body
Board of County Commissioners
Supplemental fields
SmeadsoftID
4359
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8. <br />CONSENT AGENDA PAGE <br />H. Work Order No. 5 (Engineering/Survey), Surveying and Mapping/GIS <br /> <br />Services, Indian River County Vertical Control Network (IRCVCN), <br />Project: Indian River County Vertical Control Mapping/GIS, Indian River <br />County Master Contract 0504; Nick Miller, Inc. (now doing business as <br />GlobalMind), Professional Surveyors and Mappers <br />(memorandum dated May 5, 2008) 55-62 <br /> <br /> <br />I. Work Order No. 6, (Engineering/Surveying) Masteller, Moler, Reed and <br /> <br />Taylor, Inc. – Full & Final Pay, CR512 Phase IV Roadway Improvements, <br />ndst <br />102 Terrace Abandonment & 101 Ave Re-alignment Boundary Surveys <br />(memorandum dated May 2, 2008) 63-64 <br /> <br />J. Work Order No. 9 (Engineering/Surveying), County Road 510 & US1 <br /> <br />Intersection Improvements Project, Right-of-Way & Land Acquisition – <br />Boundary Surveys, Carter Associates, Inc., IRC Project No. 0610, <br />(memorandum dated May 2, 2008) 65-78 <br /> <br /> <br />K. Kimley-Horn and Associates, Inc. Amendment No. 3 – Release of <br /> <br />thth <br />Retainage, 58 Ave and SR 60 Intersection – 58 Ave Corridor Study <br />(memorandum dated May 5, 2008) 79-80 <br /> <br />L. Work Order No. 10 (Engineering/Surveying), Carter Associates, Inc., <br /> <br />Proposed Oslo Road Boat Ramp Design and Permitting Project, Indian River <br />County Project No. 0381 Additional Survey Services <br />(memorandum dated April 28, 2008) 81-86 <br /> <br />M. Approval of Notice of Retuning Schedule between Indian River County and <br /> <br />Sprint Nextel <br />(memorandum dated May 5, 2008) 87-91 <br /> <br /> <br />N. Rejection of Indian River County Bid No. 2008036, Purchase of Portable <br /> <br />Flow Meters, Utilities Department / Wastewater Treatment Division <br />(memorandum dated May 1, 2008) 92-95 <br /> <br />9. <br />CONSTITUTIONAL OFFICERS and GOVERNMENTAL AGENCIES <br /> <br />None <br /> <br /> <br /> <br />Page 3 of 7 <br />May 13, 2008 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.