My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/21/1979
CBCC
>
Meetings
>
1970's
>
1979
>
11/21/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:40 AM
Creation date
6/11/2015 11:13:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/21/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 211919 BOOK 42 pAGE175 <br />RANBIR SINGH, CONNELL METCALF & EDDY, INC., APPROACHED <br />THE BOARD TO DISCUSS THE CONTRACT DOCUMENTS FOR ADDITIONS AND <br />RENOVATIONS TO THE ADMINISTRATION BUILDING AND THE COURTHOUSE. <br />HE STATED THAT HE WAS IMPRESSED WITH THE DETAILS RECEIVED FROM <br />CONSTRUCTION PROJECT SUPERINTENDENT KONTOULAS AFTER HIS REVIEW <br />OF THOSE DOCUMENTS, AND ADVISED THAT MOST OF THOSE COMMENTS HAVE <br />ALREADY BEEN TAKEN CARE OF. MR. SINGH NOTED THAT HE WILL BE SENDING <br />A COPY OF THE DRAFT PREPARED FOR ADVERTISING THE BIDS NEXT WEEK <br />FOR THE BOARDS REVIEW AND WOULD LIKE, IF POSSIBLE, AUTHORIZATION <br />AT THE DECEMBER 5, 1979 MEETING FOR THE ADMINISTRATOR TO ADVERTISE <br />THE PROJECT FOR BIDS. HE COMMENTED THAT THEY WILL BEGIN PRINTING <br />THE DRAWINGS AND WILL BE DISTRIBUTING SETS TO THE CONTRACTORS <br />BETWEEN DECEMBER 15TH AND 31ST; ALSO THEY WILL SCHEDULE A PRE-BID <br />CONFERENCE, MR. SINGH REPORTED THAT ALL CONTRACTORS WILL BE <br />WELCOME TO COME TO THIS CONFERENCE TO ASK QUESTIONS ON THE PROJECT. <br />HE NOTED THAT THE BIDS WILL BE OPENED ON JANUARY 23, 1980 AT THE <br />REGULAR COMMISSION MEETING, READ ALOUD, AND THE FIGURES NOTED; <br />AFTERWARD THE BIDS WILL BE ANALYZED AND THEY WILL MAKE RECOMMENDA <br />TIONS. MR. SINGH STATED THAT ON JANUARY 31, 1980 A WORKSHOP FOR <br />THE COMMISSION WILL BE SCHEDULED TO TAKE ACTION AND, HOPEFULLY, <br />AWARD THE CONTRACT; ANY FINANCING ARRANGEMENTS SHOULD BE MADE <br />AT THAT TIME. HE COMMENTED THAT THE INFLATION FACTOR IS 12% TO <br />15% PER YEAR, WHICH IS THE SCHEDULE AGREED UPON IN THE WORKSHOP <br />MEETING HELD SEVERAL MONTHS AGO, AND ANY DEVIATIONS FROM THESE <br />FUGURES CAN BE VERY COSTLY LATER. <br />DISCUSSION FOLLOWED ABOUT THE SCHOOL BOARD AND IT <br />WAS STRESSED THAT IT WAS IMPERATIVE THAT ANY AGREEMENTS SHOULD <br />BE SETTLED BY THE BIDDING DATE OF DECEMBER 15, 1979, IF POSSIBLE. <br />CHAIRMAN WODTKE EXPLAINED THAT HE HAS BEEN IN CONTACT <br />WITH DR. BURNS OF THE SCHOOL BOARD AND WITH ATTORNEY COLLINS AND <br />ATTORNEY CALDWELL AND THEY ARE IN THE PROCESS OF WORKING OUT <br />THE DETAILS OF A PROPOSED LEASE WITH THE SCHOOL BOARD. <br />THE BOARD THEN COMMENDED THE FINE WORK THAT PAIR. KONTOULAS <br />DID ON THE REVIEW OF THE DOCUMENTS, AND WERE HOPEFUL OF MEETING <br />ALL THE DEADLINES IN ORDER'TO GET THE JOB DONE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.