My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/1979
CBCC
>
Meetings
>
1970's
>
1979
>
12/19/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:40 AM
Creation date
6/11/2015 11:17:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/19/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. Introduction: The following Scope of Work defines the items necessary for <br />the renovation of the Pebble Bay Sewerage System to bring the system <br />into compliance with current Florida Department of Environmental Regu- <br />lations. <br />The Scope of Work will be divided into four (4) parts: <br />A. Treatment plant improvements <br />B. Pumping station improvements <br />C. Cost sharing analysis for improvements <br />D. Additional services <br />A. Treatment Plant Improvements: <br />1.- New blower and electrical work for blowers. <br />2. Electrical improvements to the existing master electrical control <br />panel. This panel could require replacement. <br />3. Effluent V -notch flow recorder/totalizer. <br />4. Backflow preventors on all water lines. <br />5. Convert 2 existing concrete tanks to surge tanks with mechanical <br />and electrical equipment and interconnecting piping. <br />6. Re -pipe plant from 50,000 gpd extended aeration to 100,000 gpd <br />contact stabilization. <br />7. Clean existing absorption beds (drainfield). <br />8. Clean existing percolation pond. <br />9. Install 3 groundwater monitoring wells. <br />10. Install adjustable weir plates in existing clarifiers. <br />A separate set of engineering drawings for the.treatment plant work is proposed <br />so that the work could be performed by the County Utilities Department. By <br />utilizing County forces, an approximate 15% savings of Estimated Construction <br />Cost could be realized. <br />B. Pumping Station Improvements: <br />1. Install new pump station adjacent to the existing Vera Cruz pump <br />station. Pump station requirements to be reviewed by County Utilities <br />Department prior to beginning final design of this station. <br />2. Install new pump station adjacent to the existing Pebble Bay #1 <br />Pump Station. <br />3. Install new pump station adjacent to the existing Pebble Bay #2 Pump <br />Station. <br />4. Rework existing electrical control equipment in the Sea Watch and <br />Pebble Beach Villas Pump Stations. <br />A separate set of engineering drawings and contract documents is proposed <br />for this work for the purpose of seeking competitive bids. <br />C. Cost Sharing Analysis: The Joint Venture shall assist the County <br />Utilities Department in determining the pro -rata cost share of improve- <br />ments to system. <br />D. Additional Services: <br />1. Prepare F.D.E.R. construction permit applications for the treatment <br />plant and pump stations. <br />2. Assist County in bidding, receiving bids and recommendations for <br />award of contract. <br />3. Provide detailed inspection during construction period. <br />�°°K 42 � <br />DEC 19 1979 ��F ��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.