My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/1979
CBCC
>
Meetings
>
1970's
>
1979
>
12/19/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:40 AM
Creation date
6/11/2015 11:17:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/19/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s � � <br />CHAIRMAN WODTKE ASKED WHAT HE FELT THE TREATMENT PLANT <br />IMPROVEMENTS WILL COST, AND MR. ROBBINS ESTIMATED ABOUT $18,000- <br />$20,000 FOR THE TREATMENT PLANT. HE NOTED THAT ADDITIONAL MONEY <br />WOULD BE REQUIRED FOR SURGE TANKS AND EXPLAINED THAT THESE TANKS <br />WOULD NOT BE NEEDED WHEN IT IS POSSIBLE TO TIE INTO THE CITY SYSTEM; <br />IF THE COUNTY WERE TO KEEP THE PLANT AND POSSIBLY REINSTALL IT SOME- <br />WHERE ELSE, THEY WOULD BE AN EXCELLENT IDEA. <br />CHAIRMAN WODTKE INQUIRED ABOUT THE NECESSITY OF THE PUMPING <br />STATION IMPROVEMENTS, AND MR. ROBBINS STATED THAT THEY HAVE TO BE <br />DONE IN ANY EVENT. HE CONTINUED THAT THEY ARE BASICALLY TALKING <br />ABOUT LIFT STATIONS FOR PEBBLE BAY #1 AND #2 AT AROUND $30,000 EACH, <br />AND THE LIFT STATION FOR VERA CRUZ, WHICH WOULD BE AROUND $40,000. <br />HE FELT A TOTAL COST OF $120,000 WOULD BE CONSERVATIVE. <br />CHAIRMAN WODTKE COMMENTED THAT THERE ARE PRESENTLY ABOUT <br />100 CUSTOMERS ON THIS SYSTEM, AND THE BOARD DISCUSSED ANTICIPATED <br />DEVELOPMENT. <br />COMMISSIONER LYONS POINTED OUT THAT IF WE DO NOT RENOVATE <br />THIS SYSTEM, THE DER WILL NOT ALLOW US TO CONNECT ANY FURTHER UNITS <br />TO IT, AND HE FELT UNLESS WE DO SUBSTANTIALLY ALL THE WORK RECOMMENDED, <br />WE ARE GOING TO REMAIN IN VIOLATION. <br />ATTORNEY MICHAEL O'HAIRE, WHO REPRESENTED PEBBLE BAY HOME <br />OWNERS ASSOCIATION AND VERA CRUZ, INFORMED THE BOARD THAT THEY HAVE <br />REPORTED RAW SEWAGE LYING AROUND. <br />CHAIRMAN WODTKE ASKED IF THE PROPOSED RENOVATION WILL. GET <br />THAT PLANT TO THE CAPACITY FOR THE AREA. <br />MR. ROBBINS STATED THAT THERE ARE 215 EXISTING UNITS IN <br />PEBBLE BAY, SEA WATCH, PEBBLE BAY VILLAS AND VERA CRUZ, AND THE <br />TREATMENT PLANT CAN TAKE ANOTHER 80 UNITS ON TOP OF THAT. <br />CHAIRMAN WODTKE NOTED THAT, IN OTHER WORDS, THE PLANT <br />COULD HANDLE ABOUT 300 UNITS, AND MR. ROBBINS INFORMED HIM THAT THE <br />80 UNIT FIGURE IS BASED ON A MAXIMUM DAY ANALYSIS; WITH THE ADDITION <br />OF A SURGE TANK, POSSIBLY THE NUMBER OF UNITS COULD BE INCREASED. <br />57 <br />DEC -191979 Box 42 PAGE 361 <br />
The URL can be used to link to this page
Your browser does not support the video tag.