My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/1979
CBCC
>
Meetings
>
1970's
>
1979
>
12/19/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:43:40 AM
Creation date
6/11/2015 11:17:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/19/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r - <br />DEC 191979 BOOK 49. Pac£370 <br />CHAIRMAN WODTKE NOTED THAT YOU MUST GET A CONSUMPTIVE USE <br />PERMIT, AND MR. TESSIER COMMENTED THAT AN OBSERVATION WELL IS UNUSABLE <br />AFTER THE SYSTEM IS COMPLETE EXCEPT FOR MONITORING PURPOSES. <br />CHAIRMAN WODTKE COMMENTED THAT THEY ESTIMATED BETWEEN <br />$90,000 TO $170,000 FOR THESE WELLS, AND THAT IS A BIG BALL PARK <br />FIGURE. <br />MR. TESSIER STATED THAT THEY GOT A PRICE OF $170,000 AS <br />THE MAXIMUM THAT ANY BID -SHOULD COME IN AT. THE $90,000 FIGURE WAS <br />BEFORE THEY INCREASED THE SIZE FROM 12" TO 16", AND HE POINTED OUT <br />THAT WITHOUT SPECIFICATIONS IT IS VERY DIFFICULT FOR A CONTRACTOR TO <br />COME UP WITH A REAL GOOD PRICE. <br />COMMISSIONER LYONS ASKED WHAT IS SO TRICKY ABOUT DRILLING <br />A WELL DOWN TO THE FLORIDAN AQUIFER IN THIS COUNTY, WHICH HAS BEEN <br />DONE MANY TIMES. <br />MR. ENG NOTED THAT TO USE THIS AS A PRODUCTION WELL, THE <br />MATERIAL, ETC., HAS TO BE APPROVED BY THE DER AND THEY HAVE ADDITIONAL <br />REQUIREMENTS FOR PUBLIC SUPPLY WELLS, <br />MR. TESSIER EXPLAINED THAT FOR THE 16" WELL, THE COST OF <br />16" CASING ITSELF IS CONSIDERABLY MORE THAN 12". THEY ARE OFTEN <br />DRIVEN TO THE TOP OF THE AQUIFER AND DRILLED OUT BELOW THAT. ON THIS <br />WELL, THEY WILL HAVE TO DRILL IT ALL THE WAY DOWN AND THEN CEMENT IT <br />ALL THE WAY BACK TO THE LAND SURFACE, WHICH MEANS A MINIMUM 22" <br />DIAMETER HOLE DRILLED TO THE AQUIFER, OR AROUND 400'. HE NOTED THAT <br />IF THEY WENT BACK TO A 12" DIAMETER FOR BOTH WELLS, IT WOULD LOWER <br />THE COST A BIT, BUT FOR THE PUMP, THEY NEED A MINIMUM OF 12. MR. <br />TESSIER CONTINUED THAT THEY ESTIMATE 5 TO 6-1/2 MONTHS TO COMPLETE <br />THE PROJECT, AND THE PRINCIPAL CONTROL OF THAT IS THE DRILLING FOR <br />WHICH THEY HAVE ESTIMATED S TO 12 WEEKS, THE LONGER IT TAKES, THE <br />LARGER THE COST. <br />ATTORNEY COLLINS INQUIRED ABOUT THE WELL SITE, AND MR. ENG <br />STATED THAT THEY ARE SEARCHING FOR A PROPOSED TREATMENT PLANT SITE; <br />ONE WELL WILL BE LOCATED THERE AND THE OTHER ABOUT 1,000' AWAY. THEY <br />DO NOT KNOW THE EXACT LOCATION AT THIS TIME, BUT HOPE TO KNOW BY <br />SOMETIME NEXT MONTH AND GET AN OPTION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.