Laserfiche WebLink
r <br />DEC 191979 <br />Boa <br />42 <br />PAGE372 <br />COMMISSIONER LYONS COMMENTED THAT <br />HE HATES TO <br />BUY <br />A PIG <br />IN A POKE, AND FELT OUR UTILITIES DIRECTOR SHOULD BE MORE INTIMATELY <br />INVOLVED WITH ALL THIS BEFORE IT COMES TO US. <br />CHAIRMAN WODTKE NOTED THAT WE NEED TO MAKE A DECISION AS <br />TO THE BASIS ON' WHICH WE WANT GERAGHTY & MILLER TO PROCEED. HE THEN <br />DISCUSSED POSSIBLE DRAWDOWNS AND ASKED AT WHAT POINT WE WILL HAVE <br />SOME INFORMATION ON THAT. MR. TESSIER STATED IT WOULD NOT BE UNTIL <br />THE WELLS ARE COMPLETED AND MONITORED. <br />CHAIRMAN WODTKE ASKED HOW MUCH DELAY WOULD BE INVOLVED IF <br />THEY PROCEEDED JUST WITH TASKS 1 AND 2, AND MR. TESSIER STATED THE <br />SPECIFICATIONS WILL ACTUALLY TAKE MUCH LESS TIME THAN THE INVENTORY, <br />AND FELT IT MIGHT DELAY THE PROGRAM BY TWO WEEKS TO A MONTH. <br />ATTORNEY COLLINS NOTED THAT IF A 30 OR 15 DAY TERMINATION <br />AGREEMENT WERE INCLUDED IN THE CONTRACT, YOU COULD STOP IT, BUT NOT <br />INTERRUPT THE NATURAL FLOW OF WORK. <br />THE CHAIRMAN STATED THAT HE WISHED TO PROCEED AS QUICKLY <br />AS POSSIBLE, BUT DID NOT WANT TO SPEND ANY MORE MONEY THAN ABSOLUTELY <br />NECESSARY. IN FURTHER DISCUSSION, IT WAS NOTED THAT EVEN IF AN <br />OBSERVATION WELL IS FOUND, THEY STILL HAVE TO DRILL THE 16" WELL. <br />MR. ENG SUGGESTED THAT IF IT IS NECESSARY TO DRILL AN <br />OBSERVATION WELL, THAT THEY GO TO A 12" WELL, WHICH WILL SAVE MONEY <br />IN THE LONG RUN. HE COMMENTED THAT HE HAD ALLOCATED ABOUT SIX MONTHS <br />FOR THE TEST WELL PROGRAM AND ANTICIPATED BEGINNING DESIGN ON THE <br />TREATMENT PLANT IN FEBRUARY. MR. ENG DID NOT FEEL A 3 - 6 WEEK DELAY <br />WOULD JEOPARDIZE THE SCHEDULE OF THE TOTAL PROJECT. <br />CHAIRMAN WODTKE STATED THAT HE DID NOT HAVE A PROBLEM <br />AUTHORIZING THE WELL PROGRAM AS SET OUT, WITH A TERMINATION CLAUSE. <br />MOTION WAS MADE BY COMMISSIONER LYONS, SECONDED BY COM- <br />MISSIONER LOY, THAT THE CHAIRMAN BE AUTHORIZED TO SIGN A CONTRACT <br />WITH GERAGHTY & MILLER TO PROCEED WITH TASKS 1 THROUGH 5 AS OUTLINED <br />IN GERAGHTY & MILLER'S LETTER OF DECEMBER 12, 1979, WITH A RIGHT <br />TO TERMINATE WITHIN 15 DAYS. <br />67 <br />