Laserfiche WebLink
DEC 19 1979 42 Faso R <br />BEINDORF AND ASSOCIATES, Inc. <br />3889 • 20TH STREET <br />POSTVERO OFFICE BOX <br />LORID <br />q ,i •'l VERO BEACH FLORIDA 32960 <br />JAMES L. SEINDORF. P. E. fes\ .,' /U TELEPHONE 305/562-7981 <br />J <br />KENNETH W. DAMEROW Cb <br />RICHARD B. VOTAPKA, P. E N <br />G'`��^•�a -, Gf <br />v L,� <br />December 11, 1979 0 <br />Mr. Jack G. Jennings <br />County Administrator <br />Indian River County <br />Room 115 County Courthouse <br />Vero Beach, Florida 32960 <br />Re: Village Green <br />Phase II <br />Dear Mr. Jennings: <br />I am enclosing herewith a copy of the site plan for Phase II of the subject job. <br />I spoke to you on Monday, December 10, 1979, concerning the developer posting a <br />bond for a portion of the work which is now being completed. The purpose of the <br />bond is to allow the developer to pull a permit to start placing and finishing <br />the necessary improvements around mobile homes in the eastern portion of Phase <br />II of Village Green. I am showing the area to be covered under the cash bond <br />colored in red on the enclosed drawing. I would appreciate if you would deter- <br />mine whether or not you would be able to give the Zoning Department and the <br />Building Department the necessary approval for trailers to be moved in the area <br />described above based upon the fact that the owner will post a cash bond to <br />cover the portion of the road, drainage, water system, and sewerage system yet <br />to be completed. The amount of monies covering these unfinished items are as <br />follows: <br />IT21UAQ NTITY UNIT PRICE AMOUNT <br />1. Paving and Drainage <br />a. 6" Soil Cement Base 9230 S.Y. $ 3.20 $29,536.00 <br />b. 1" Asphaltic Surface 9230 S.Y. 1.65 15,229.50 <br />c. Miami Curb and Gutter 716 L.F. 4.40 3,150.40 <br />d. 6' Valley Gutter 192 L.F. 10.75 2,064.00 <br />e. Curb Inlets 501. s 6 Ea. 1,225.00 3,675.00, <br />ITEM QUANTITY UNIT PRICE AMOUNT <br />2. Water Distribution System <br />a. 6" Gate Valves 2 Ea.. $ 265.00 $ 530.00 <br />b. 6" PVC Pipe 325 L.F. 8.25 2,681.25 <br />3. Force Main and Lift Station <br />a. 3" PVC Pipe 950 L.E. $ 4.95 $ 4,702.50 <br />b. 3" D.I. Pipe 50 L.F. 11.00 550.00 <br />c. Fittings 350.00 350.00 <br />d. Lift Station (Complete) 50% 19,200.00 9,600.00 <br />Subtotal $72,068.65 <br />10% Contingency 7,206.87 <br />$79,275.52 <br />Round To $80,000.00 <br />I would like to point out that the above unit prices shown to arrive at the bond <br />cost are actual bid prices under contract by Village Green to the Dickerson <br />group. These are not estimated prices. If you agree with the above and will <br />allow the owner to post an $80,000.00 cash bond, I Mould appreciate your early <br />reply. <br />Very truly yours, <br />BEINDORF AND ASSOCIATES, INC. <br />James L. Beindorf <br />