My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/05/2009
CBCC
>
Meetings
>
2000's
>
2009
>
05/05/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2022 11:32:50 AM
Creation date
10/1/2015 6:16:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda
Meeting Date
05/05/2009
Meeting Body
Board of County Commissioners
Supplemental fields
SmeadsoftID
5582
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. CONSENT AGENDA PAGE <br />G. Work Order No. 6 (Engineering/Surveying) Kimley-Horn and Associates, <br />Inc. — Full & Final Pay, Indian River Blvd. Sidewalk Improvement Project, <br />121' Street to 171' Street, 14'h Street Bridge Elevation Detail Survey, IRC <br />Project No. 0745, Continuing Professional Surveying & Mapping/GIS <br />Services <br />(memorandum dated April 16, 2009) 52-53 <br />H. Work Order No. 7, (Engineering/Surveying) — Final Pay & Release of <br />Retainage Masteller, Moler, Reed, and Taylor, Inc., CR512 Phase III <br />Roadway Improvements, Final Right -of -Way Mapping Project IRC Project <br />No. 961113, Continuing Professional Surveying & Mapping/GIS Services <br />Contract 0725 <br />-(memorandum-dated April 21, 2009)__________________________________________________________ 54-55 <br />L Choose Life License Plate Funding, Distribution of Funds to Care Net <br />Pregnancy Center of Indian River Co. <br />-(memorandum-dated April _27,2009) ---------------------------------------------------------_ 56757 <br />J. Oslo Road Boat Ramp, Retainage Release for Pelican Pete Construction Co. <br />Inc., IRC Project No. 0381 <br />-(memorandum-dated April 28, 2009)__________________________________________________________ 58763 <br />K. Professional Environmental Services Agreement, Oslo Boat Ramp — IRC <br />Project No. 0381, G.K. Environmental, Inc., Release of Retainage <br />-(memorandum-dated April 28, 2009)__________________________________________________________ 64-65 <br />L. Providing Geotechnical Services for Oslo Road and Oslo Road Boat Ramp <br />Improvements Dunkelberger Engineering & Testing, Inc., Work Order No. 3 <br />— Release of Retainage IRC Project 40381 <br />-(memorandum-dated April 28, 2009)__________________________________________________________ 66767 <br />M. Work Order No. 10 (Engineering/Surveying) Carter Associates, Inc. — <br />Release of Retainage, Proposed Oslo Road Boat Ramp Design and <br />Permitting Project, Indian River County Project No. 0381 <br />(memorandum dated April _29,2009) 68769 <br />N. Declare additional excess equipment surplus for sale or disposal, and <br />removal of one vehicle from the previously approved list <br />(memorandum dated April 28, 2009) 70771 <br />O. IRC Sheriff's Administration Underground Fuel Tanks Geosyntec <br />Consultants Work Order 421 <br />(memorandum dated April _27,2009) 72-91 <br />May 5, 2009 Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.