Laserfiche WebLink
Commissioner O’Bryan pointed out that there had been numerous math errors in the <br />report at the workshop meeting. Director Keating explained how the math errors occurred, and <br />stated that the consultant has revised the report. <br /> <br />NO ACTION REQUIRED OR TAKEN. <br /> <br />TH <br />9.B.2. RSJT.WR11S <br />EQUEST TO PEAK FROM OE IGGINS EGARDING TREET <br />S.W.P <br /> AVING <br />th <br />Mr. & Mrs. Joe T. Wiggins, <br />895 11 St. SW, wanted to know why their property, <br />which was 60-80 feet from the road, was not included in a County road paving project that stopped <br />th <br />at 9 Court, S.W. Mr. Wiggins was concerned about exposed telephone wires, dead trees in the <br />right-of-way, hurricane evacuation, and drainage on his property. <br /> <br />Public Works Director Jim Davis described the boundaries of the paving project, <br />and explained that Tim Rose, the contractor, wanted $17,000.00 to extend the paving project to <br />the Wiggins’s property. He assured the Wiggins’ that the County would provide a driveway <br />connection in the right-of-way to the public road and remarked that the work could proceed in the <br />Fall of 2007, after the contractor finishes the current paving project. <br /> <br />Mr. And Mrs. Wiggins were concerned about a drainage problem ensuing from the <br />paved roads, and Director Davis assured them that there would not be a problem. <br /> <br />Chairman Wheeler wanted to know how the paving project was funded, to which <br />Director Davis replied that it was County funded because the project connected all the Oslo Park <br />Roads to the Thompson Elementary School. <br /> <br />June 12, 2007 17 <br /> <br />