My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2008
CBCC
>
Meetings
>
2000's
>
2008
>
06/17/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 10:35:36 AM
Creation date
10/1/2015 6:19:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
06/17/2008
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
4019
Supplemental fields
SmeadsoftID
7246
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.0. INDIANRIVER COUNTY—PUBLIC WORKS. GEOGRAPHIC <br />INFORMATIONSYSTEM (GIS) SERVICES. INDIAN RIVER CONTRACT <br />NO. 0826. PRIVITYAGREEMENT AND WORK ORDER NO. I <br />(SURVEYING/TRAFFICENGINEERING) WITHNORTHSTAR GEOMATICS, <br />INC. <br />Commissioner O'Bryan wanted to know if the project's expense could be justified <br />in terms of necessity to public health, safety, and welfare, and he inquired what other costs might <br />surface subsequent to Work Order No. 1, which would only provide for a GIS Traffic Sign <br />inventory. <br />Assistant Public Works Director Chris Mora related that inventorying the signs and <br />placing them into the GIS system, would be very helpful in terms of replacing them after an <br />emergency, and in discerning the age and condition of the signs. He noted that there would be an <br />update to the Manual on Uniform Traffic Control Devices (MUTCD) in 2009, which would <br />require Counties to track things like reflectivity. <br />Director Mora responded to questions regarding what additional work and costs <br />might ensue after the completion of the sign inventory, and whether crucial emergency <br />information would be inputted into the GIS System prior to the mapping of the traffic signs. He <br />thereafter informed the Board that staff was asking to piggyback the contract with the City of <br />Stuart, and conveyed that staff would be returning with more information. <br />MOTION WAS MADE by Commissioner O'Bryan, <br />SECONDED by Vice Chairman Davis, for discussion, to <br />table this item until staff comes back with the full price <br />and scope of the project. <br />12 <br />June 17, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.