My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/17/2008
CBCC
>
Meetings
>
2000's
>
2008
>
06/17/2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 10:35:36 AM
Creation date
10/1/2015 6:19:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
06/17/2008
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
4019
Supplemental fields
SmeadsoftID
7246
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12..1.2. CHANGE ORDER NO. I TO IRC CONTRACT 2007044 WITH WELLS AND <br />WATER SYSTEMS, INC. FOR THE CONSTRUCTION OF WELLS 7 <br />THROUGH 9 AT THE NORTH COUNTYR0 FACILITY <br />Utilities Director Erik Olson recalled that in September 2007, the Board had <br />approved construction of three wells at the North County Reverse Osmosis (RO) Facility. <br />Director Olson recapped the backup memorandum of May 27, 2008 to provide background <br />information on the St. Johns River Water Management District's (SJRWMD) recommendation to <br />construct an additional three wells, which recommendation was accepted by the County. He <br />explained staff's rationale for selecting the original contractor of the first three wells, Wells and <br />Water Systems, Inc., to do the additional work, and thereafter asked the Board to approve staff's <br />recommendation for Change Order No. 1 to the contract with Wells and Water Systems, Inc. <br />Commissioner Flescher, MOVED, SECONDED by <br />Commissioner Wheeler, for discussion, to approve staff's <br />recommendation, the construction of the three additional <br />wells. <br />Director Olson responded to questions from Commissioner Wheeler regarding a <br />time -line for completion of the wells, and for evaluation of the impacts on the surrounding <br />agricultural areas. <br />The Chairman CALLED THE QUESTION and the <br />Motion carried unanimously. The Board approved <br />Change Order No. 1 to IRC Contract 2007044 with Wells <br />and Water Systems, Inc., to construct three additional <br />23 <br />June 17, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.