My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/19/2007 (2)
CBCC
>
Meetings
>
2000's
>
2007
>
06/19/2007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 4:22:27 PM
Creation date
10/1/2015 6:12:57 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
06/19/2007
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
3132
Subject
SJRWMD and Corrigan Family Proposed Land Swap Objection
Supplemental fields
SmeadsoftID
3097
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Wells disclosed that Mr. Chestnut had received a permit for the sea wall which <br />encroaches upon his (Mr. Wells') property and extends past the survey pin, even though he (Mr. <br />Chestnut) has not had a final inspection. Mr. Wells felt there was a great inequity here, since he <br />himself had spent $4,000 to remove his driveway to comply with Code Enforcement. <br />Community Development Director Bob Keating said that Mr. Wells had met with staff, the <br />St. Johns River Water Management District, and the Department of Environmental Protection <br />(DEP). Commissioner O'Bryan wanted to know what exactly the County would be responsible <br />for. <br />Community Development Chief Roland DeBlois made observations regarding the dock and <br />permitting issues, and related that Mr. Chestnut had received a DEP permit and applied for a <br />second County permit for the dock extension. Chief DeBlois disclosed that the State had met <br />with Mr. Chestnut to discuss the removal or relocation of the boatlifts. <br />Commissioner O'Bryan wanted to know how long it would take for Mr. Chestnut to get the <br />proper permitting. Chief DeBlois stated that Mr. Chestnut immediately applied for the dock <br />permit and the item is slated to go before the Code Enforcement Board at the next July meeting. <br />He added that the Saint Johns River Water Management District and the DEP are addressing <br />some of the other issues mentioned by Mr. Wells. <br />Commissioner Wheeler wanted clarification from Mr. Wells on what issues the County <br />could address. Mr. Wells wanted to know why the seawall was allowed to remain oversized. <br />Chief DeBlois declared that the building department had rechecked the wall and concluded that it <br />had been built as permitted, as a regular or retaining wall, and not as a seawall. Director Buddy <br />Akins, Building Division, added that the length of the sea wall was not included when the building <br />permit was issued; the wall conformed to the site plan, and the permit was issued. <br />June 19, 2007 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.