My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/6/1980
CBCC
>
Meetings
>
1980's
>
1980
>
2/6/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:51 AM
Creation date
6/11/2015 11:21:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/06/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR. ROBBINS THEN INFORMED THE BOARD THAT THEY ORIGINALLY <br />STATED THEIR ENGINEERING FEES WOULD BE ABOUT $77,000, BUT NOW FIND <br />THEY WILL BE $4,000 TO $5,000 UNDER THAT AMOUNT. HE CONTINUED THAT <br />IF THERE IS ANYTHING FURTHER THE BOARD DESIRES, THEY WILL BE GLAD <br />TO DO IT UNDER THEIR BASIC SERVICES AGREEMENT. HE THEN ASKED IF <br />THE BOARD MIGHT WISH TO LEAVE THE CONTRACT AS IT IS AND HAVE THEM <br />PERFORM FUTURE SERVICES OF INSPECTION ON THIS BASIS. <br />ADMINISTRATOR .JENNINGS REQUESTED THAT THE BOARD CONSIDER <br />LETTING THE CONTRACT STAY IN EFFECT. HE POINTED OUT THAT THERE IS <br />GOING TO BE A LOT OF WORK TO BE DONE ON THE BRIDGES ON A CONTINUING <br />BASIS, AND IF IT CAN BE WORKED IN SUCH A WAY THAT THE CONTRACT CAN <br />REMAIN IN EFFECT, THEN WE CAN CALL FOR THE ENGINEERS AS THEY ARE <br />NEEDED, THE ADMINISTRATOR COMPLIMENTED THE ENGINEERS ON DOING A <br />FINE JOB IN A VERY PROFESSIONAL MANNER AND STATED THAT THE COUNTY <br />WILL BE MAKING USE OF THE WORK DONE AND BENEFITING FROM THIS STUDY <br />FOR YEARS TO COME. <br />COMMISSIONER Loy COMMENTED THAT THE ENGINEERS REFERRED TO <br />80 BRIDGES, BUT THERE ARE 81 LISTED. MR. ROBBINS EXPLAINED THAT <br />THERE WAS A TYPOGRAPHICAL ERROR, AND BRIDGE #88010 WAS LISTED TWICE. <br />MRS._ ROBBINS THEN PROCEEDED TO GIVE AN UPDATE ON THE <br />WABASSO BRIDGE, THE STATUS OF WHICH HE HAD OUTLINED IN HIS LETTER <br />OF SEPTEMBER 5, 1979, AS FOLLOWS: <br />FEB 61980 61 a good: 42, -PACE 58.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.