My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/21/2007 (2)
CBCC
>
Meetings
>
2000's
>
2007
>
06/21/2007 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2017 3:24:59 PM
Creation date
10/1/2015 6:12:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop - Water Supply
Document Type
Minutes
Meeting Date
06/21/2007
Archived Roll/Disk#
3132
Subject
Alternative Water Supply Master Plan
Supplemental fields
SmeadsoftID
3072
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. INTRODUCTIONS <br />Utilities Services Director Erik Olson introduced the following individuals: <br />Deputy Director of St. Johns River Water Management District (SJRWMD) Mike Slayton; <br />Utility Services Engineer Himanshu Mehta; Capital Projects Manager Mike Hotchkiss; Henry <br />Dean with Water Management; Jill Grimaldi and Dr. Patrick Gleason, Consultants with Camp <br />Dresser and McKee, Inc. (CDM) <br />4. PROJECT HISTORY <br />Director Olson provided a brief history of the project, announced that this public <br />workshop was the second of two, and stated the purpose was to develop a future pathway to <br />supplement the County's current water supply system and water treatment process. Through a <br />PowerPoint presentation, he provided a "demand and implementation schedule", which reflected <br />production capacity and maximum customer demands from 2005 through 2025. Director Olson <br />informed the Board that the decisions made at this workshop would be formally introduced to the <br />Board in July, and that the project would need to be in place by 2017. <br />A. OVERVIEW OF GOALS AND OBJECTIVES FOR WORKSHOP <br />B. NORTH COUNTY WATER TREATMENT PLANT EXPANSION <br />Utility Service Engineer Himanshu Mehta, used a PowerPoint presentation to brief <br />the Board on the County's two water treatment plants, pointing out that the County's public <br />water supply has been relying on the North and South Reverse Osmosis (RO) plants for over 25 <br />years. <br />Engineer Mehta explained that the Master Plan of 2004 provided for the expansion <br />of the North County water plant, and said the expected completion would be in 2009. He <br />disclosed the details of the expansion phase and said that it would give capacity through 2011, <br />emphasizing that the expansion would be a five-year process. <br />2 <br />June 21, 2007 <br />ALTERNATIVE WATER SUPPY <br />MASTER PLAN PUBLIC WORKSHOP <br />
The URL can be used to link to this page
Your browser does not support the video tag.