Laserfiche WebLink
I2.H. RECREATION -NONE <br />12.L PUBLIC WORKS-NoNE <br />12.J. UTILITIES SERVICES <br />12.J.1. CONTINUING CONSULTING SERVICES WORK ORDER No. 8 WITH <br />BRIDGE DESIGNASSOCIATEs. INC FOR DESIGN OF FORCE MAIN <br />RELOCATION ON 16TH STREET BRIDGE AT UTHAVENUE, UCP 3079 <br />Michael Hotchkiss, Capital Projects Manager, explained that this item was a Work <br />Order to design the approach pipe routing and the force main crossing. It would be a <br />continuation of services provided by Bridge Design Associates, Inc. for the 16th Street Bridge. <br />ON MOTION by Vice Chairman Davis, SECONDED by <br />Commissioner Flescher, the Board unanimously approved <br />Work Order No. 8 with Bridge Design Services, Inc. in the <br />amount of $4,814.00, for engineering design of the force <br />main crossing of the 16th Street Bridge at 74th Avenue, <br />and authorized the Chairman to execute the same, as <br />presented, and as recommended in the memorandum of <br />May 15, 2008. <br />WORK ORDER IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />32 <br />June 3, 2008 <br />