My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/20/1980
CBCC
>
Meetings
>
1980's
>
1980
>
2/20/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:23:05 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/20/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MR. SINGH.INFORMED THE BOARD THAT BOTH CONTRACTORS HAVE <br />ENCLOSED BID BONDS FOR 5% OF THEIR TOTAL BID AND EACH ACKNOWLEDGES <br />RECEIPT OF ALL THREE ADDENDUMS. DISCUSSION THEN FOLLOWED ON THE <br />ALTERNATE 1 BID OF CLIFTON CONSTRUCTION, WHICH AMOUNTED TO $45,855 <br />AND WHICH MR. SINGH READ AS A UNIT PRICE. IT WAS FELT THIS MUST <br />BE AN ERROR, AND -THAT THIS MUST BE THE TOTAL PRICE FOR ALL THE <br />WINDOWS. IT WAS FURTHER NOTED THAT THESE BIDS ARE GOOD FOR SIXTY <br />DAYS. <br />MOTION WAS MADE BY COMMISSIONER WODTKE, SECONDED BY COMMIS- <br />SIONER LYONS, TO REFER THE ABOVE BIDS TO CONNELL, METCALF & EDDY <br />FOR EVALUATION AND A REPORT BACK NO LATER THAN FEBRUARY 29TH. <br />DISCUSSION ENSUED ON HAVING A WORKSHOP MEETING, AND HERCULES <br />KONTOULAS, COUNTY CONSTRUCTION PROJECT REPRESENTATIVE, SUGGESTED <br />THAT A SPECIAL MEETING BE CALLED IN ORDER TO EXPEDITE MATTERS. <br />CHAIRMAN SIEBERT STATED THAT WHEN THE ARCHITECTS CALL AND <br />INFORM US THEY ARE READY, A SPECIAL MEETING WILL BE SET UP. <br />A GENTLEMAN FROM THE AUDIENCE REQUESTED THAT MR. SINGH <br />READ OUT THE SURETY USED BY EACH BIDDER. HE STATED THAT IF THE <br />BONDING COMPANY DOES NOT COMPLY WITH STATE REGULATIONS, THEN THE <br />BID IS NOT RESPONSIVE. <br />MR. SINGH INFORMED THOSE PRESENT THAT THE SURETY FOR CLIFTON <br />CONSTRUCTION & ENGINEERING, INC., IS SEABOARD SURETY COMPANY OF NEW <br />YORK AND THE SURETY FOR REINHOLD CONSTRUCTION, INC., IS GULF INSURANCE <br />COMPANY OF ATLANTA. <br />THE CHAIRMAN CALLED FOR THE QUESTION. IT WAS VOTED ON AND <br />CARRIED UNANIMOUSLY. <br />THE BOARD DISCUSSED THE RESPONSE TO THE BID INVITATION. <br />MR. KIRSCH OF CONNELL, METCALF & EDDY INFORMED THEM THAT IN ADDITION <br />TO THE ADVERTISEMENT, AND AFTER EXTENDING THE DUE DATE FOUR WEEKS, <br />THEY HAD CALLED OVER THIRTY CONTRACTORS FROM MIAMI TO DAYTONA BEACH AND OVER TO <br />ORLANDO, AND TODAY'S BIDS ARE THE ONLY RESPONSE. HE NOTED THAT THE <br />SOUTH FLORIDA CONSTRUCTION MARKET IS VERY SATURATED AT THIS TIME, <br />AND STATED THAT HE PERSONALLY IS SATISFIED WITH THE OUTCOME. <br />FEB 2 01980 61` <br />
The URL can be used to link to this page
Your browser does not support the video tag.