My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/27/1980
CBCC
>
Meetings
>
1980's
>
1980
>
2/27/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:23:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
02/27/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OVER THE STATE. THE ONLY JOB EVER DONE IN VERO BEACH WAS REMODELING <br />THE OLD MOVIE THEATRE. HE CONTINUED THAT THE NUMBER OF EMPLOYEES <br />VARIES WITH THE AMOUNT OF WORK; THEY HAVE THREE ACTIVE PROJECTS <br />CURRENTLY AND A PAYROLL OF 45 PEOPLE, BUT AT OTHER TIMES THEY HAVE <br />HAD AS MANY AS ISD ON THE PAYROLL. <br />MR; REINHOLD STATED THAT HE IS THE PRESIDENT AND CHIEF <br />EXECUTIVE OFFICER OF REINHOLD CONSTRUCTION AND IS 46 YEARS OLD. <br />MR.. SNODGRASS, WHO IS 48, IS THE VICE PRESIDENT, AND THEY HAVE TWO <br />SUPERINTENDENTS, WHO HAVE BEEN WITH THE COMPANY FOR OVER 10 YEARS. <br />IN REGARD TO CAPITALIZATION AND FINANCIAL STATEMENTS, HE NOTED THAT, <br />SINCE THEY ARE PRIVATELY HELD, THEY DO NOT ISSUE FINANCIAL STATEMENTS <br />UNLESS IT IS A REQUIREMENT OF THE CONTRACT. HE POINTED OUT THAT HIS <br />BUSINESS IS BUILDING BUILDINGS AND HE HAS GUARANTEES THAT WILL ASSURE <br />THAT THE BUILDING WILL BE COMPLETED. AS TO QUALITY, MR: REINHOLD <br />FELT THAT THEY DO AS WELL AS OR BETTER THAN 95% OF THOSE THEY COMPETE <br />AGAINST BECAUSE THEY HAVE QUALITY CRAFTSMEN WORKING FOR THEM AND <br />MAKE EVERY EFFORT TO EMPLOY SKILLED SUBCONTRACTORS. <br />COMMISSIONER LYONS EXPLAINED TO MR, REINHOLD THAT THE <br />COUNTY IS VERY SENSITIVE ABOUT THIS MATTER BECAUSE OF THE BAD EXPERIENCE <br />WITH THE BUILDING OF THE NEW HOSPITAL. <br />COMMISSIONER LOY BROUGHT UP THE RECOMMENDATIONS MADE.BY <br />THE CONSULTANT AND ASKED MR. REINHOLD IF HE FELT THERE WOULD BE ANY <br />PROBLEM IN ADHERING TO THE CONSTRUCTION SCHEDULE. <br />MR. REINHOLD INFORMED THE BOARD THAT HE BID IN TWO SEPARATE <br />CONTRACTS FOR SEVERAL REASONS. FIRST, HE DID NOT WANT A CONSTRAINT <br />PUT ON THEM OF HAVING TO WAIT 725 DAYS OR HAVING ANYONE THINK THEY <br />WERE GOING TO TAKE 725 DAYS TO DO THE WORK, WHICH HE FELT WAS WAY TOO <br />LONG A PERIOD OF TIME. HE FURTHER NOTED THAT SHOULD THE CONTRACT <br />BE A COMBINED CONTRACT, THE CONTRACTOR COULD BE PREVENTED FROM <br />STARTING WORK ON THE COURTHOUSE BUILDING FOR ABOUT SIX TO SEVEN MONTHS. <br />HE STATED THAT HE WISHED TO COMMENCE CONSTRUCTION ON BOTH PROJECTS <br />AT THE SAME TIME UNDER SEPARATE CONTRACTS AND WOULD HOPE TO COMPLETE <br />FEB 2 71980 <br />5 s�oK 42, Fou 796 <br />
The URL can be used to link to this page
Your browser does not support the video tag.