Laserfiche WebLink
$60,917.00; and Health Insurance increased $43, 440.00. Several positions were eliminated: <br />three (3) full-time and two (2) part-time in Road and Bridge; Public Works eliminated one (1) <br />full-time position; Engineering eliminated two (2) full-time positions; and three (3) full-time <br />Traffic and Land Acquisition Agents in Transportation were also eliminated. <br />Chairman Wheeler asked how this Engineering cut would affect us, and whether it would <br />hamper what we were doing with bridges and new roads, as well as other transportation matters. <br />Administrator Baird thought we still have more engineers than we had in the past. <br />Administrator Baird said staff was still looking at more manpower and outside <br />contracting. He did not believe this would slow the process down. He offered to put the <br />positions back in if the Board desired. <br />Commissioner Davis asked if these cuts would slow down projects like the Phase 4 CR <br />512, and in getting permits out. Administrator Baird informed him that the majority of the <br />design was done by outside engineers and would not affect like projects. <br />Administrator Baird continued his presentation, announcing that the Road and Bridge <br />department showed a 6.2% reduction, Public Works had a 14.75% reduction, Engineering had a <br />9.9% reduction, Traffic Engineering had a 10.5% reduction, Real Estate Acquisition's proposed <br />budget is $138,267.00, and Stormwater had a 7.8% reduction. <br />The Chairman called a break at 10:37 a.m. and reconvened the Workshop at 10:54 a.m., <br />with Commissioner Davis absent. <br />EMERGENCY SERVICES DISTRICT - FIRE RESCUE <br />Administrator Baird said this District, under State Legislation, only has to have a 3% cut, <br />with which we have complied. The proposed budget is $32,168,398.00, a decrease of 8.5%, and <br />the majority of this decrease is due to the building of fire stations. <br />July 18, 2007 8 <br />