My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/9/1980
CBCC
>
Meetings
>
1980's
>
1980
>
4/9/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:21:00 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/09/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR 91990 - - <br />0 <br />mpmnR 4Nnl im <br />TO: Board of County Commissioners <br />FROM: County Administrator <br />Bnox 43- PaCE 215. . <br />April 9, 1980 <br />SUBJECT: Renovation of Court House, Annex and County Admin. Building <br />A meeting was held with Reinhold Construction representatives and County <br />representatives, Wednesday April 2, 1980. The purpose of this meeting was to discuss <br />renovatinj areas. <br />The Contractor would like to start both renovation projects -simultaneously, <br />April 21, 1980-. The contract allows this, however, the contract also states our work <br />will not be disrupted. The starting date of Aoril 21, poses no problem at the Old <br />Hospital site. There is a tremendous logistic problem at the Court House regardless <br />of the beginning date. <br />Reinhold construction plan of renovation designates the North East corner, first <br />floor (Administrative area) and the Southern 2/3rds of the second floor as early <br />demolition areas. The demolition of the covered ramp and the construction of the elevator <br />would also be in the early stages. Their plan can be supported, however, it will require <br />the utmost cooperation between all parties and the rental of additional office space, <br />court room and hearing rooms on a temporary basis. <br />There are three alternatives to the renovating of these buildings. <br />ALT. 1 Begin simultaneously renovating of both sites - extend the Court House <br />contract to coincide with the Administrative building. <br />This would require: <br />Rental of additional office space for the County Administrator's office <br />and staff including the Secretary to the Board of C. C. (2,000 sq. ft.) <br />The Supervisor of Elections ( 900 sq. ft.) <br />The Sheriff's Office (1,425 sq. ft.) <br />Youth Guidance -Office, (155 sq. ft.) and the Courts, (6,000 sq. ft.) <br />Freda Wright will redistribute her personnel to facilitate renovating of her <br />spaces. <br />The Tax Collector and Property Appraiser's area will not be renovated until they <br />are relocated. <br />The Courts pose the greatest problem to the alternative. The Judges are concerned <br />that demolition and construction will interferewith their conducting court and hearings. <br />The most affected area would be those courts that require verbatim recordings of the <br />proceedings. Another area of concern is the security of sensitive hearings, such as <br />adoption, child abuse, etc. If the alternative was selected, appropriate space would <br />be required to hold court and hearings. <br />Advantaqe: <br />1. Earliest completion of both buildings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.