Laserfiche WebLink
of that portion of 53rd Street to coordinate with the County's construction of the canal bridge and <br />the portions of 53rd east of the bridge. Based upon bids that DiVosta has received, the cost of <br />this construction will be approximately $2.2 to $2.5 million. <br />(b) Fill for 53rd Street — DiVosta will furnish to the County fill (not to exceed 100,000 cubic <br />yards of fill) for use by the County in the construction of 53rd Street east of the lateral H Canal. <br />The fill will be at no cost to the County, but the County will be responsible for the transportation. <br />At the current price of fill of $2.50 per yard, this is a savings to the County of $250,000. <br />(c) Drainage — The Waterway Village DO contemplates that the drainage of 53rd Street would <br />be accommodated in the drainage system for Waterway Village. The construction of 53rd Street <br />is described in paragraph La. above, and will require that DiVosta dig an approximate 3 -acre <br />lake to receive the drainage from 53rd Street. DiVosta will also install the required piping from <br />the roadway to the lake and furnish required easements to the County. The cost of this work is <br />estimated by DiVosta to be approximately $200,000 without taking into account the land value <br />of the three acres. <br />(2) 58th Avenue <br />(a) DiVosta will, at its own cost and expense, construct 58th Avenue as a 4 -lane roadway <br />between 49th Street and 53rd Street. <br />(b) Said construction will be accomplished when the traffic model of the County determines <br />that the construction is needed because of traffic volumes, the County and DiVosta to agree upon <br />the methodology of any such model. However, in any event and irrespective of modeling, the <br />construction will commence no later than January 1, 2015. <br />(c) DiVosta will receive 100% traffic impact fee credits for all design, engineering and <br />construction costs for these 58th Avenue improvements, in addition to impact fee credits <br />available for other offsite improvements as provided under the DA. <br />(3) DiVosta will prepay all impact fees for 1,596 units in Waterway Village by December 31, <br />2015 (except for those for which it has received impact fee credits) unless those impact fees are <br />paid earlier at the time of issuance of building permit. <br />29 <br />July 21, 2009 <br />