My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/7/1980
CBCC
>
Meetings
>
1980's
>
1980
>
5/7/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:26:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/07/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r � <br />MAY 7 1980 soor 43 . PAGE 440 <br />COMMISSIONER WODTKE WANTED TO BE ASSURED THAT THE SIGNAL <br />WILL BE INSTALLED ACCORDING TO THE REGULATIONS OF THE DOT. <br />ADMINISTRATOR JENNINGS NOTED THERE WILL BE A LEFT TURN <br />SIGNAL ON THE LIGHT, AND ATTORNEY DARLSON STATED THAT IT WAS A <br />REQUIREMENT OF THE DOT. <br />COMMISSIONER Loy WONDERED WHO DECIDED WHEN THE APPROPRIATE <br />TIME WAS FOR PUTTING UP THE LIGHT. <br />ATTORNEY DARLSON REPORTED THAT THE DOT IS IN CONTROL OF <br />THE SIGNALIZATION. <br />MEMBERS OF THE BOARD EXPRESSED CONCERN FOR OUR CITIZENS <br />AT THAT INTERSECTION. <br />ATTORNEY DARLSON REFERRED TO THE FOLLOWING LETTER FROM <br />SIGNAL CONSTRUCTION COMPANY: <br />Mr. Joe Collins <br />County Attorney <br />Indian River County <br />P.O. Box 3686 - Beach Station <br />Vero Beach, Florida 32960 <br />Dear Mr. Collins, <br />April 21, 1980 <br />With respect to the proposed traffic signal for the Shopping <br />Center at U.S.-1 and Oslo Road, please be advised that we <br />have reviewed the traffic requirements for this intersection <br />and made a preliminary design study for the intersection equip- <br />ment. <br />In conversation with Peter C. Smith Assoc., we have determined <br />that if this intersection is constructed that the budget allow- <br />ance of $30,000. would be adequate to cover all construction <br />costs within the next 12 months for this proposed construction. <br />This amount, we understand, is to be placed in escrow with the <br />County to guarantee the construction of the signal if it is <br />needed. <br />Our firm will guarantee to provide for the construction of this <br />intersection in accordance with the DOT standard and Indian River <br />requirements for the above amount and we have been asked to ad- <br />vise the County of this so that this project may be implemented <br />or proceed as needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.