My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/7/1980
CBCC
>
Meetings
>
1980's
>
1980
>
5/7/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:52 AM
Creation date
6/11/2015 11:26:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/07/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
43 PAGE 466. <br />EXAMPLE: A 10 -acre tract of land designed <br />to contain 20 single family residential <br />dwellings shall pay a contribution of 10 <br />acres X 4 units per acre (minimum density) <br />X $100.00 per unit = $4,000.00 for this 10 <br />acres. <br />EXAMPLE: A 10 -acre tract of land designed <br />to contain 50 single family residential <br />dwellings shall pay a contribution of 10 <br />acres X 5 units per acre <br />X $100.00 per unit = $5,000.00 for this 10 <br />acres. <br />For properties devoted to use as single family residential <br />subdivisions, the County shall bring its water distribution and <br />sewage collection mains to a point at the boundary of Developer's <br />property in closest proximity to the then present terminus of the <br />County's lines and in accordance with the County's engineering <br />plan for extension. All internal water distribution and <br />sewage collection lines, including any lift station required for <br />use solely within Developer's property shall be at the cost and <br />expense of Developer. <br />B. As to Multi -Family Dwell <br />More Apartments). <br />Linked to Three or <br />For all properties devoted to use '.-as multi -family <br />condominium or apartment development, a contribution in aid of <br />construction shall be paid to County in an amount equal to <br />$70.00 per unit. <br />EXAMPLE: A 10 -acre tract of land having a <br />proposed density of 20 units per acre shall <br />pay a contribution as follows: 10 acres X <br />20 units per acre X $70.00 = $14,000.00 for this <br />10 acres. <br />The County shall provide water distribution and sewage <br />collection mains to one side of Developer's property, which side <br />shall be in closest proximity to the then existing terminus of <br />the County's lines and in accordance with the County's plans for <br />extensions. Developer may tap the County's water and sewer mains <br />at one or more points along the portion of the extension abutting <br />Developer's property. Developer shall be responsible for all <br />internal water distribution mains, sewage collection mains or any <br />lift station to be used solely by consumers on Developer's <br />property, at Developer's sole cost and expense. <br />C. As to Commercial Uses. <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.