My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/2/2005
CBCC
>
Meetings
>
2000's
>
2005
>
08/2/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2018 3:23:09 PM
Creation date
10/1/2015 5:59:52 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC
Document Type
Minutes
Meeting Date
08/02/2005
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
3031
Book and Page
129, 271-299
Supplemental fields
SmeadsoftID
252
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />th <br />Mr. Donadio, <br />Donadio and Associates, 609 17 Street, explained how the ridge <br />tiles, ridge boards, and eave tiles would be secured. Both types have good warranties and both are <br />approved under the new Miami-Dade wind load testing requirements. A tile roof has a 50-year life <br />and a metal roof has a 25-year life. He gave assurance that the tile roofs will be attached to meet all <br />the requirements. <br /> <br />There was CONSENSUS to leave the barrel tile roof as designed. <br /> <br />Commissioner Wheeler wanted to table this matter to obtain more information, and <br />County Administrator Baird advised that staff was concerned about the time table but admitted this <br />could be held off for a week. He submitted the figures for the differences. These amounts were <br />projected on the overhead (copy in the backup) and explained by County Administrator Baird. <br />Commissioner Wheeler was concerned about the expenditure of additional funds although he saw <br />some advantages and disadvantages. <br />Discussion ensued about the hardening of the buildings and wind standards. <br />Commissioner Bowden advised she would not be present at the next meeting but has <br />done some research and favors the off-site location. Both Chairman Lowther and Commissioner <br />Davis stated they were satisfied with the earlier decision. <br /> <br />Commissioner Wheeler MOVED TO RECONSIDER <br />AND TABLE THIS MATTER; there was no second so the <br />motion failed. <br /> <br />11.I.1. PUBLIC WORKS – INTERSECTION IMPROVEMENTS AT <br />TH <br />58 AVENUE AND SR 60 – KIMLEY-HORN AND <br />ASSOCIATES, INC. - CIVIL ENGINEERING AND LAND <br />SURVEYING AGREEMENT – AMENDMENT NO. 1 <br />August 2, 2005 19 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.