Laserfiche WebLink
as soon as possible. Joint Venture will assist in <br />preparation of request. <br />6. County request requirements from DER and EPA for certifi- <br />cation to use mosquito impoundments as soon as possible. <br />Joint Venture will assist in preparation of request. <br />7. County authorize Joint Venture to prepare application <br />to EPA for Step 2 funding assistance. <br />Submission of Step 2.application may be initiated after <br />approval to 201 Plan by the County. This application <br />needs to be submitted as soon as possible to be placed <br />on EPA's priority funding list. <br />8. County work toward finalizing interlocal agreement with <br />Vero Beach. <br />9. Joint Venture present to the County a proposed program <br />for funding the local share of Phase I, determine the <br />limits of Phase I, and prepare a report based.on FmHA <br />requirements for necessary collection, minor trans- <br />mission and pumping systems, and determine rate structure <br />required. Program scheduled for presentation to County <br />for review, approval and authorization in July, 1980. <br />3 <br />e � M <br />MAY 2x.1980 eooK 43' Face 56� . <br />