Laserfiche WebLink
SAY 2 11980 <br />BOOK 4'r� � pAcfW <br />(4) AUTHORIZATION TO SPEND ABOUT $4,000 FOR SEEDLINGS AND MATERIAL <br />NECESSARY TO STABILIZE THE BLUFF LINE. <br />CHAIRMAN SIEBERT FELT THE BOARD NEEDED SOME RECOMMENDATION <br />ON WHAT ITEMS SHOULD BE BID. <br />MR. MARSH NOTED THAT HE HAS DISCUSSED THIS. WITH ADMINISTRATOR <br />JENNINGS, AND THEY BELIEVE IT IS WITHIN THE CAPABILITY OF THE COUNTY <br />FORCES TO DO A LOT OF THIS WORK. THE PROBLEM THEY HAVE IS THE JULY <br />VACATION PERIOD AND TRYING TO ACCOMPLISH THIS PROJECT IN A SHORT <br />PERIOD OF TIME. MR. MARSH STATED THAT IT WAS THE FEELING OF EVERYONE <br />CONCERNED THAT IT WOULD BE ADVISABLE TO GO OUT FOR BIDS ON THE RELIEF <br />STATION, THE GAZEBO, THE BOARDWALK AND PERHAPS EVEN THE ADDITIONAL <br />TWO CROSSOVERS, AND THEY WERE CONSIDERING ADDING AS AN OPTION THE <br />UTILITIES CONSTRUCTION THAT WOULD BE REQUIRED — WATER, SEWER, POWER, ETC. <br />ADMINISTRATOR JENNI.NGS SUGGESTED, BECAUSE OF THE LOAD BEING <br />IMPOSED ON THE ROAD & BRIDGE DEPARTMENT, GOING TO BID BUT DOING IT <br />IN ALTERNATES SO THAT ANY BID CAN BE ACCEPTED OR REJECTED WITHOUT <br />AFFECTING THE OTHER. IN THIS WAY, IF SOME OF THE BIDS PROVE TO BE <br />UNSATISFACTORY, WE CAN MOVE AHEAD WITH THE COUNTY FORCES. <br />COMMISSIONER DEESON STATED THAT AS. MUCH AS HE WOULD LIKE <br />TO SEE THIS COMPLETED BY NOVEMBER, HE WOULD BE A LITTLE CONCERNED ABOUT <br />THE COST INVOLVED IN PUTTING IT OUT TO BID VERSUS COUNTY CREWS DOING <br />IT AT SOME OTHER TIME. <br />CHAIRMAN SIEBERT ASKED ABOUT THE PROBLEM OF CONSTRUCTION , <br />BEING CARRIED ON IN THE PARK IN THE SUMMERTIME WHEN THE PUBLIC IS <br />USING IT DAILY. <br />COMMISSIONER LOY NOTED THE SEEDING AND STABILIZATION OF THE <br />BLUFF LINE TO KEEP THAT AREA FROM ERODING IS MOST IMPORTANT AND MUST <br />BE DONE IMMEDIATELY. SHE SHARED EVERYONE'S CONCERN ABOUT INTERFERING <br />WITH THE PUBLIC S ENJOYMENT OF THE BEACH, BUT FELT WITH THE SCHEDULE <br />THAT HAS BEEN OUTLINED AND THE VACATIONS OF THE ROAD & BRIDGE PEOPLE <br />THROUGHOUT JULY, THAT WE WOULD NOT INTERFERE WITH THE PUBLIC TOO <br />MUCH. COMMISSIONER LOY FELT WE SHOULD CARRY OUT THE EARLY PART OF <br />THE SCHEDULE AND IN THE MEANTIME BID SOME OF THE ITEMS BECAUSE WE <br />CANNOT AFFORD TO PUT OUR WORK CREWS OUT THERE FOR THREE SOLID WEEKS. <br />