Laserfiche WebLink
s � � <br />PROJECT COST ESTIMATES <br />GIFFORD SEWAGE SYSTEM IMPROVEMENTS <br />TREATMENT PLANT - ALTERNATIVES <br />KINGS HIGHWAY - ALTERNATE NO. 1 (EXISTING DESIGN) <br />LINDSEY ROAD - ALTERNATE NO. 2 (PROPOSED) <br />JOB NOS. 5675C/5675G <br />MAY 27, 1980 <br />•• <br />JUN 4 1980 6009 � PAGE 6 <br />Kings Hwy. <br />Lindsey Rd. <br />. <br />Alt. No. 1 <br />Alt. No. 2 <br />A. <br />Construction <br />$265,345.25(1) <br />$221,310.75(2) <br />B. <br />Additional Engineering <br />To Complete <br />1. Basic/Redesign $ 5,035 <br />$-24 <br />2. Add. Service -Permits 1,500(3} <br />8,000(4} <br />3. Resident Inspection 12,000 <br />12,000 <br />3 Se Od O. !!0 <br />TOTAL44-1498--99 <br />C. <br />Land Cost <br />110,000.00 <br />88,000.00 <br />D. <br />Contingency @ 15% of A. <br />Construction for Inflation <br />From 9/5/79 <br />39,801.00 <br />33,256.00 <br />#Lf33,-IR <br />(1) <br />Based on Low Bid Received 9/5/79 <br />(2) <br />Includes a Add. 2640 L.F. Fence <br />b� Add. Access Rd. & Site <br />Preparation <br />c) Move Trt. Plt. Units to <br />Site <br />d) Adjustment to Other Quantities <br />See Attachment "A" <br />(3) <br />Re-Bid/Negotiations ' <br />(4) <br />Site Certifications & Permits ' <br />•• <br />JUN 4 1980 6009 � PAGE 6 <br />