Laserfiche WebLink
1 <br />1 <br />1 <br />Sverdrup d Parcel and Deindorf b Assoc. <br />CW <br />_I <br />.lObt//3/O�t'.�' <br />•c•GTe.°c".t."�(/.+•lTc ��•%>•e7 <br />IRC - PHASE It GIFFORD SEWAGE SYSTEM IMPROVEMENTS <br />// <br />Cf R11 F I CAI I Ott <br />CCti:RACIOk <br />CONUACIOR <br />CUti7n:,C70R <br />I DO HEREBY CERTIFY THAT THE FOL LOVING 810 <br />ENGINEER'S <br />EST19ATE <br />CHAPMAN•CONSTRUCTION, <br />DRIVEWAYS, INC. <br />TABULATION IS A TRUE ASD ACCURATE REPRODUCTION <br />LNC . <br />1714'Horton Drive <br />3300 South SL. <br />OF TUE BIDS RECEIVED <br />Titusville, FL 32780 <br />Orange Park, FL <br />BY <br />Item <br />No. <br />Description <br />Estimated <br />Quantities <br />L'nit <br />Unit <br />Price <br />A_�eunt <br />L'n!t <br />I. Price <br />Amount <br />Unit <br />Price <br />Annunt <br />C`S.T <br />I <br />G1.ViT <br />4*�{r/'(f/y <br />QTa'�/t.,.t <br />21. <br />Furnish and construct new <br />8" VC sewer line and remove <br />existing sewer designated <br />item "N" on exhibit 2F-1 <br />L.S. <br />10,000.00 <br />12,580.00 <br />+8.580.00 <br />*Per letter <br />9/7/79 <br />i <br />t <br />L• <br />i <br />TOTAL DID PRICE I <br />$209,095,00 <br />$304,002.75 <br />$265,345.2 <br />I <br />22/3/4.7 <br />Did Received Snot_ 5. 1070 <br />Sverdrup d Parcel and Deindorf b Assoc. <br />CW <br />_I <br />