My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/18/1980
CBCC
>
Meetings
>
1980's
>
1980
>
6/18/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 12:07:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/18/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F_ <br />JUN 18 19 90 BooK 43 ?AcE ,782 <br />MR. MARSH COMMENTED THAT THEIR RECOMMENDATION IS BASED <br />NOT ONLY ON LONG TERM NEEDS, BUT ALSO SHORT TERM AND MID TERM NEEDS <br />AS WELL, AS STRESSED IN THE LAST PARAGRAPH OF MR. REVER'S MEMO. <br />CHAIRMAN SIEBERT ASKED IF MR. REUTER HAD SAID HE WOULD <br />DEDICATE THE RIGHT-OF-WAY, AND MR. MARSH FELT HE HAD JUST INDICATED <br />HE WOULD BE FAVORABLY INCLINED TO NEGOTIATE. MR. MARSH CONTINUED <br />THAT HE HAD INFORMED MR. REUTER THAT IT WOULD BE MARGINAL AS TO HOW <br />MUCH WE COULD DO AS FAR AS ADDITIONAL DENSITY WAS CONCERNED, <br />DENSITY. <br />THE BOARD STATED POSITIVELY THAT WE CANNOT NEGOTIATE AS TO <br />MR. MARSH DID NOT FEEL THAT THE DEVELOPER WOULD PARTICIPATE <br />IN THE COST OF THE ROAD. <br />ASSISTANT ADMINISTRATOR NELSON INFORMED THE BOARD THAT THE <br />COSTS SET OUT IN THE DRAWING ARE JUST BASIC COSTS FOR SOIL CEMENT <br />AND ASPHALT, AND THIS DOES NOT INCLUDE ANY CULVERTS OR HEADWALLS <br />THAT MIGHT BE NEEDED. <br />DISCUSSION FOLLOWED AS TO CLEARING LAND AND OBTAINING <br />RIGHTS-OF-WAY. COMMISSIONER LYONS FELT AS A NORMAL PROCEDURE, WE <br />WOULD GET 50'. <br />MR. MARSH STATED THAT IT IS THE PLANNING DEPARTMENT'S <br />OPINION THAT WE COULD EXACT 50' FROM THE DEVELOPER BASED ON THE FACT <br />THAT IT IS A MAJOR THOROUGHFARE, BUT DID NOT BELIEVE WE COULD REQUIRE <br />HIM TO PAVE THE FULL ROAD BECAUSE THERE ALREADY IS A SUBDIVISION ON <br />THE EAST SIDE. <br />COMMISSIONER LYONS POINTED OUT THAT IN THE DRI PROCESS IF <br />IT IS FELT A ROAD NEEDS TO BE WIDENED, THAT IS WHAT IS REQUIRED. HE <br />FURTHER POINTED OUT THAT THIS IS GOING TO BE AN IMPORTANT PART OF <br />OUR FUTURE ROAD NETWORK AND 20TH AVENUE WILL BE A THROUGH ROAD WITH <br />A LOT OF TRAFFIC. HE, THEREFORE, DID NOT FEEL WE SHOULD HAVE A JOG AND <br />TURN WHEN WE COULD HAVE A REGULAR FOUR-WAY INTERSECTION WITH A MAIN <br />STREET. <br />DISCUSSION THEN ENSUED REGARDING THE FACT THAT THE BRIDGE <br />SYSTEM ON 19TH AVENUE IS NOT ADEQUATE TO PROPERLY ACCOMMODATE SCHOOL <br />BUS TRAFFIC, AND ADMINISTRATOR JENNINGS CONFIRMED THAT THOSE CULVERTS <br />WHEN INSTALLED WERE NOT REQUIRED TO BE OF A SUFFICIENT WIDTH TO COPE <br />
The URL can be used to link to this page
Your browser does not support the video tag.