Laserfiche WebLink
K <br />J U L 9 19 80 Box 44 FAGS 28 <br />MR. MARSH THEN PROCEEDED TO DISCUSS AN OVERSIGHT DUE TO <br />LACK OF COMMUNICATION, WHICH RELATES TO THE CENTER WALKOVER LEADING <br />FROM THE RELIEF STATION AND TO THE BOARDWALK ITSELF. THEY HAD <br />THOUGHT THIS WAS DRAWN AT AN 8% SLOPE TO FACILITATE THE HANDICAPPED, <br />BUT IN FURTHER CHECKING, FOUND THAT THIS WAS NOT DONE. THE ONLY <br />WAY TO RECTIFY THIS IS TO RUN A PARALLEL SYSTEM IMMEDIATELY TO THE <br />SOUTH OF THE EXISTING CENTRAL WALKOVER, ESTABLISH A LANDING, AND <br />TIE IT INTO THE WALKOVER ITSELF. THIS WILL REQUIRE AN IMMEDIATE <br />CHANGE IN OUR PLANS OR IT WILL REQUIRE A CHANGE ORDER LATER ON: THE <br />HANDICAPPED MUST BE ABLE TO GET TO THE WALKOVER AND THE GAZEBO. EVEN <br />THOUGH IT WILL INVOLVE SEVERAL HUNDRED MORE DOLLARS, HE BELIEVED NOW <br />IS THE TIME TO DO IT BECAUSE A CHANGE ORDER WOULD COST US MUCH MORE. <br />MR. MARSH STATED THAT HE WOULD LIKE TO HAVE AUTHORITY TO GO AHEAD <br />AND CHANGE THIS BEFORE THE BIDS ARE RELEASED. <br />COMMISSIONER Loy WISHED TO BE ASSURED THAT THE RECOMMENDED <br />CHANGE MEETS THE STANDARDS REQUIRED FOR THE HANDICAPPED, AND COMMIS- <br />SIONER LYONS ASKED HOW THE HANDICAPPED GET OFF THE GROUND ONTO THE <br />WALKWAY. <br />MR, MARSH STATED THAT WE WOULD PUT IN A WOOD RAMP AND LET <br />THEM COME IN THE CENTRAL WALKWAY. <br />ON MOTION BY COMMISSIONER Loy, SECONDED BY COMMISSIONER <br />LYONS, THE BOARD UNANIMOUSLY APPROVED CHANGING THE WABASSO BEACH <br />DEVELOPMENT PLAN AS DESCRIBED ABOVE TO MEET THE REQUIRED STANDARDS <br />FOR THE HANDICAPPED. <br />COMMISSIONER LYONS BROUGHT TO THE ATTENTION OF THE BOARD <br />THE FOLLOWING LETTER WRITTEN BY THE ADMINISTRATOR IN REGARD TO THE <br />NEED FOR HAVING A RESIDENT ENGINEER FROM CONNELL, METCALF & EDDY TO <br />EXPEDITE PROGRESS ON THE COUNTY ADMINISTRATION COMPLEX: <br />2M m <br />