My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/9/1980
CBCC
>
Meetings
>
1980's
>
1980
>
7/9/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:48:53 AM
Creation date
6/11/2015 12:10:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/09/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />JUL 9 1980 <br />BOOK 44 RAGF 38 <br />CHAIRMAN SIEBERT INFORMED THE BOARD THAT THE THIRD ITEM <br />DISCUSSED WITH THE SCHOOL BOARD IS THE PROPOSED SOCCER COMPLEX IN <br />THE VERO BEACH ELEMENTARY SCHOOL AREA, AS PER THE FOLLOWING DRAFT: <br />DRAFT <br />PROPOSED SOCCER COMPLEX <br />LOCATED AT 12TH STREET AND 20TH AVENUE <br />AGREEMENT OF INTENT <br />INDIAN RIVER COUNTY SCHOOL BOARD- <br />INDIAN RIVER. COUNTY COMMISSION <br />'VERO BEACH CITY COUNCIL <br />The proposed capital expenditures would be $150,00�D_00. One-third of these <br />costs would be borne by each of the County School Board, the County Commission, <br />and the City Council. This construction figure could be divided over the next <br />two (2) fiscal years. <br />Capital Expenditure could include material, equipm-nt, and labor. <br />The proposal would be for three joint soccer and football fields with <br />two (2) of them lighted. <br />CONSTRUCTION ESTIMATE FOR PROPOSED SOCCER COMPLEX <br />EQUIPMENT: <br />I. Lighting - two fields <br />2. Soccer goals - two fields <br />3. Goals - two fields (nets) <br />4. Bleachers - four sets (seats 180) <br />5. Player benches - two fields <br />FILL REQUIREMENT (18") (three fields) <br />16,000 cu. yd. with compaction <br />grading, spreading <br />CATCH BASINS (4) <br />PIPING, HEADWALLS (2) <br />SURVEY AND TOPOGRAPICA.L WORN (Beindorf engineer) <br />ENGINEERING COST FOR SITE WORK <br />SPRINTMER SYSTEM <br />SEEDING/SOD - Sprigging #419 grass <br />TREE REMOVAL (without landfill charges) <br />CONTINGENCY <br />ME/308A/G1 <br />38 _ <br />$32,000.00 <br />1,000.00 <br />200.00 <br />4,000.00 <br />400.00 <br />44,800.00 <br />4,000.00 <br />4,000.00 <br />11,000.00 <br />600.00 <br />4,000.00 <br />6,000.00 <br />3,000.00 <br />8,000.00 <br />27.000.00 <br />$150,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.